Interior renovations and utility upgrades at 8132 Park Ln

Permits indicate interior renovation work at 8132 Park Ln, including changes to a reception area, studio, work room and shower/changing area. A commercial alteration permit was filed Dec. 12, 2025, followed by plumbing and electrical permits filed Feb. 3 and Feb. 5, 2026, for washer, shower and heating-related work.

Summarized from City of Dallas records · updated Feb 5, 2026

Projects
3
3 filings
Latest filing
Feb 5, 2026
since Dec 12, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Install power to 6 heaters install power to dryer in back roominstall gfci receptacles in shower roomlower outlet by front doorchange 2 pendent lights

    Install power to 6 heaters install power to dryer in back roominstall gfci receptacles in shower roomlower outlet by front doorchange 2 pendent lights

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-000495
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Pipe in new washer box and shower upgrade with h to 50 gallon electric

    Pipe in new washer box and shower upgrade with h to 50 gallon electric

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-000389
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Mcr general- painting all walls, flooring repairs, install cove base throughout building certificate of occupancy required prior to occupancyreception area- new reception desk built/install, cabinets installstudio- remove existing acoustical panels from wall, install mirrors on wall, install cabinets, move around electrical outletswork room- floor repairs to accommodate washer/dryer installation shower/changing- move and add drain, floor repair, relocate light fixtures, install new shower, install stem walls, tiling wall, add shelvingrestrooms- remove existing sinks and mirrors, install new sinks, install new mirrors, install new vanity mechanical- cap off existing ducts for rooms 101, 103, 104, 105, and 106, install new split hvac system and duct work for rooms 101, 103, 104, 105 ,and 106, install new exhaust vent for room 104 (shower/changing room)electrical- replace lamps with led, replace pendant fixtures, floor mounted electrical boxes to be replaced with low profile boxes, relocate electrical wall outlets, install ceiling mounted suspended heating panels, bring power to serve location of washer and dryer plumbing- remove existing water heater and install new fifty gallon water heater, bring water to location of washer and dryer and installing new drain lines, install new hot and cold water service to new shower in room 104, install new drain line for room 104, install new hot and cold water service to bathrooms, installation of new sinks for bathrooms, install new water fountain in hallway

    Mcr general- painting all walls, flooring repairs, install cove base throughout building certificate of occupancy required prior to occupancyreception area- new reception desk built/install, cabinets installstudio- remove existing acoustical panels from wall, install mirrors on wall, install cabinets, move around electrical outletswork room- floor repairs to accommodate washer/dryer installation shower/changing- move and add drain, floor repair, relocate light fixtures, install new shower, install stem walls, tiling wall, add shelvingrestrooms- remove existing sinks and mirrors, install new sinks, install new mirrors, install new vanity mechanical- cap off existing ducts for rooms 101, 103, 104, 105, and 106, install new split hvac system and duct work for rooms 101, 103, 104, 105 ,and 106, install new exhaust vent for room 104 (shower/changing room)electrical- replace lamps with led, replace pendant fixtures, floor mounted electrical boxes to be replaced with low profile boxes, relocate electrical wall outlets, install ceiling mounted suspended heating panels, bring power to serve location of washer and dryer plumbing- remove existing water heater and install new fifty gallon water heater, bring water to location of washer and dryer and installing new drain lines, install new hot and cold water service to new shower in room 104, install new drain line for room 104, install new hot and cold water service to bathrooms, installation of new sinks for bathrooms, install new water fountain in hallway

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001608
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 8132 Park Ln

What is being built at 8132 Park Ln in Dallas?

Permits indicate an interior renovation, not a new building. The work includes updates to a reception area, studio, work room and shower/changing area.

When were permits filed for work at 8132 Park Ln?

The commercial alteration permit, COM-ALT-ADD-25-001608, was filed Dec. 12, 2025. Plumbing permit COM-PLM-26-000389 followed on Feb. 3, 2026, and electrical permit COM-ELC-26-000495 was filed Feb. 5, 2026.

What renovation work is planned at 8132 Park Ln?

The alteration permit describes interior finish repairs and updates to the reception desk, studio, work room, shower/changing area and restrooms. It also lists a new split HVAC system and changes to electrical and plumbing systems.

Are washer and dryer connections being added at 8132 Park Ln?

Yes. The alteration and plumbing permits describe bringing water and drainage to a washer and dryer location; the Feb. 3, 2026 plumbing permit also lists a new washer box.

Is a new shower being installed at 8132 Park Ln?

The Dec. 12, 2025 alteration permit describes a new shower and related plumbing and room work. The Feb. 3, 2026 plumbing permit also lists a shower upgrade.

What electrical work is permitted at 8132 Park Ln?

The Feb. 5, 2026 electrical permit lists power for six heaters and a dryer, GFCI receptacles in the shower room, an outlet change near the front door and replacement of two pendant lights.

What's being renovated near Mirasol Park Lane?

At 8132 Park Ln, about 92 meters from Mirasol Park Lane – Renovations at 8100 Park Lane, permits indicate interior renovations and electrical and plumbing upgrades. The alteration permit was filed Dec. 12, 2025.

Also being built nearby

All of 75231
Get alerts for 8132 Park Ln