8307 Meadow Road
Dallas, TX 75231 · Dallas ISD
McShan Elementary front-entry renovation in Dallas
Dallas ISD registered a renovation at Lee A. McShan Jr. Elementary School on December 16, 2024. The work includes creating a secured vestibule at the front entry and replacing the exterior marquee sign. The TDLR registration lists 1,605 square feet and an applicant-estimated project cost of $597,131.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 16, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 16, 2024
- since Dec 16, 2024
- Largest scope
- 1,605 sf
- Estimated cost
- $597K
- state registration
Where this project stands
Inspected · closing outDISD: McShan ES Renovations
1,605 sq ft · $597K est.
- RegisteredDec 16, 2024
- Plan review
- ConstructionJan '25 – Dec '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovation of front entry to create a secured vestibule and replacement of an exterior marquee sign. — lee a. mcshan jr. elementary school
TDLR project registrationRenovation/AlterationInspection Complete1,605 sq ft$597K est.- Project #
- TABS2025007800
- Tenant / owner
- Disd: Mcshan Es Renovations
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 8307 Meadow Road
What is being built at 8307 Meadow Road?
A renovation at Lee A. McShan Jr. Elementary School will create a secured front-entry vestibule and replace the exterior marquee sign. The TDLR project registration is dated December 16, 2024.
Is a new school being built at 8307 Meadow Road?
The record describes renovation work at Lee A. McShan Jr. Elementary School, not construction of a new school.
What work is planned at McShan Elementary?
The registered scope includes a secured vestibule at the front entry and replacement of the exterior marquee sign.
When was the McShan Elementary renovation filed?
The TDLR registration, project TABS2025007800, was filed December 16, 2024. Its listed status is Inspection Complete.
How much will the McShan Elementary renovation cost?
The TDLR record lists an applicant-estimated cost of $597,131. This is an estimate for the project.
What is being renovated near Kith & Co on Meadow Road?
The project at 8307 Meadow Road is a front-entry renovation at Lee A. McShan Jr. Elementary School, including a secured vestibule and a replacement exterior marquee sign. Kith & Co is listed at 8330 Meadow Road.
Also being built nearby
All of 75231- 8307 Meadow RdSep 15, 2026Second story rennovation
- 8320 Meadow RdNov 17, 2020Oncor to power on the meter for street lights · 58 m away
- 8325 Meadow RdNov 9, 2020Repair fire damage no structural changes · 73 m away
- 8330 Meadow Road · Kith & Co LLCSep 4, 2025Mama's acupuncture ti — renovation/alteration — renovation of approximately 940 sq ft of office space for a acupuncture office. the tenant improvements are located on the first floor of an existing building. the program contains lobby/waiting area, storage room, and five (5) treatment rooms f · 99 m away
- 8330 Meadow RdDec 8, 2025Add new outlets lighting and controls · 99 m away
- 8340 Meadow RdOct 19, 2026Replacing the electric water heater under a counter · 139 m away
- 8350 Meadow Road · Trinity Interests, Inc.Jul 27, 2026Merritt design group — renovation/alteration — interior renovation · 180 m away
- 8350 Meadow RdOct 19, 2026Scan concrete deck to locate any cables or conduit at sink locationcore hole for sink waste at new locationget into occupied space below, run 2" copper drain from sink location, and connect to closest waste line.run copper line overhead to serve sink and ice machineset sink, faucet, ice machine, and provide and install point of use water heater.note: ice machine drain to be pumped to sink drain. pump furnished by others · 180 m away
- 8260 Milroy LnOct 7, 2026Hvac replacment4 ton el22v condenser with horizontal evaporator coil · 229 m away
- 8213 Meadow RdOct 17, 20255 light post need to taken off city electricity and tied into building panel electricity through underground conduit · 247 m away
- 8234 Laflin LnAug 24, 2026Gas test · 271 m away
- 8218 Laflin LnJan 15, 2021Construct new sfd · 271 m away