groundranger
Recent · latest filing Jan 2026Commercial

9384 N Central Expy

Dallas, TX 75231 · 9358 North Central Expressway Dallas, LLC

Commercial interior finish-out at 9384 N Central Expy

City of Dallas permits indicate an interior demolition and commercial finish-out at 9384 N Central Expy. The demolition permit was filed June 4, 2025; alteration and finish-out, plumbing, mechanical and electrical permits followed in January 2026. The records do not identify a tenant or business.

Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Jan 26, 2026

Projects
6
6 filings
Latest filing
Jan 26, 2026
since Mar 29, 2025
Largest scope
11,801 sf
Estimated cost
$530K
state registration

Where this project stands

Inspected · closing out

Hyper Kidz

11,801 sq ft · $530K est.

  1. RegisteredMar 29, 2025
  2. Plan review
  3. ConstructionApr '25 – Jun '25
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 3 phone numbers

Permit & project history

6 projects
  1. Plumbing as plan

    Plumbing as plan

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-000312
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Hvac as plan

    Hvac as plan

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000162
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Electrical as plan

    Electrical as plan

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-000361
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Zo bc commercial finish-out

    Zo bc commercial finish-out

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-000739
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. 1 (e) interior partition wall to be removed. g.c. to patch and repair adjacent wall affected by demolition.2 (e) door, frame & hardware to be removed.3 (e) sink to be removed. gc to cap & seal any necessary plumbing lines not being reused.4 (e) restroom fixtures & accessories to be removed, u.n.o. gc to cap & seal any necessary plumbing lines not being reused. gc to prepare floor & ceiling to receive new finishes.5 (e) drywall ceiling above to be removed.6 (e) emergency light shall remain.7 (e) exit sign shall remain.8 (e) interior window to be removed.9 (e) water heater to be removed. gc to cap & seal any necessary plumbing lines not being reused.10 (e) electrical panel shall remain.11 (e) transformer shall remain.12 (e) electrical panel to be removed.13 (e) exterior door & hardware shall remain.14 (e) exterior door & side light shall remain.15 (e) exterior rolling door shall remain.16 (e) duct shall remain.17 (e) metal column shall remain.18 (e) emergency light shall remain.19 (e) exit sign to be removed.a (e) interior wall finishes to be removed. gc to patch & prepare walls to receive new finishes.b (e) flooring material to be removed. gc to prepare slab to receive new floor finishes.c (e) acoustical ceiling to be removed. fire sprinkler system to remain. gc to coordinate with fire sprinkler system plans

    1 (e) interior partition wall to be removed. g.c. to patch and repair adjacent wall affected by demolition.2 (e) door, frame & hardware to be removed.3 (e) sink to be removed. gc to cap & seal any necessary plumbing lines not being reused.4 (e) restroom fixtures & accessories to be removed, u.n.o. gc to cap & seal any necessary plumbing lines not being reused. gc to prepare floor & ceiling to receive new finishes.5 (e) drywall ceiling above to be removed.6 (e) emergency light shall remain.7 (e) exit sign shall remain.8 (e) interior window to be removed.9 (e) water heater to be removed. gc to cap & seal any necessary plumbing lines not being reused.10 (e) electrical panel shall remain.11 (e) transformer shall remain.12 (e) electrical panel to be removed.13 (e) exterior door & hardware shall remain.14 (e) exterior door & side light shall remain.15 (e) exterior rolling door shall remain.16 (e) duct shall remain.17 (e) metal column shall remain.18 (e) emergency light shall remain.19 (e) exit sign to be removed.a (e) interior wall finishes to be removed. gc to patch & prepare walls to receive new finishes.b (e) flooring material to be removed. gc to prepare slab to receive new floor finishes.c (e) acoustical ceiling to be removed. fire sprinkler system to remain. gc to coordinate with fire sprinkler system plans

    City of Dallas permitCommercial Demolition Permit
    Record
    COM-DEM-25-000018
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Hyper Kidz

    This project involves the interior build-out of an 11,801 sq ft the scope includes the construction of 4 party rooms, lobby/reception area, an office, a lactation room, restrooms, a janitor closet, and an electrical & storage room. — best buy plaza

    TDLR project registrationRenovation/AlterationInspection Complete11,801 sq ft$530K est.
    Tenant / owner
    Hyper Kidz
    Design firm
    Pro
    Contact
    Pro

Sources: City of Dallas · Texas Department of Licensing and Regulation

Questions about 9384 N Central Expy

What is being built at 9384 N Central Expy?

City of Dallas permits indicate a commercial interior finish-out, with related plumbing, mechanical and electrical work. The records do not name a tenant or business.

When were permits filed for 9384 N Central Expy?

The demolition permit, COM-DEM-25-000018, was filed June 4, 2025. Finish-out and related trade permits were filed January 23 and 26, 2026.

Is a new business opening at 9384 N Central Expy?

The permit records do not identify a business or tenant, so they do not establish what will occupy the space.

What work is planned at 9384 N Central Expy?

The June 2025 demolition permit describes removing interior partitions, finishes, fixtures and other elements. January 2026 permits cover commercial finish-out, plumbing, HVAC and electrical work.

What is being built near Cool Schools South Dallas Greening Initiative?

A commercial interior finish-out is indicated at 9384 N Central Expy, about 71 meters from Cool Schools South Dallas Greening Initiative at 9400 N Central Expressway. The permits do not identify the future occupant.

Is the work at 9384 N Central Expy a demolition or a renovation?

The records show both interior demolition and a later commercial alteration/finish-out. The demolition permit was filed June 4, 2025, and the finish-out permit was filed January 23, 2026.

Also being built nearby

All of 75231

More demolitions in 75231, warehouses & industrial in 75231, offices in 75231.

Email me when the project is closed