1336 Maureen Dr
Dallas, TX 75232
1336 Maureen Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 1336 Maureen Dr, Dallas, TX 75232. The most recent, filed June 2, 2025, covers: “For gas test as gas has been turned off”.
Compiled from City of Dallas records · updated Jun 2, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 2, 2025
- since Jun 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 1336 Maureen Dr
What is being built at 1336 Maureen Dr?
The latest filing (City of Dallas permit RES-PLM-25-001045, June 2, 2025) covers for gas test as gas has been turned off.
How many permits and filings does 1336 Maureen Dr have?
2 filings across 2 projects, from June 2, 2025 to June 2, 2025.
Is there other construction near 1336 Maureen Dr?
Yes. Nearby filings include 1412 Brook Valley Ln (gas repair/relay and gas test, Dec 5, 2025); 1327 Drury Dr (gas pressure test only no repair, Feb 27, 2026); 1239 Brook Valley Ln (re roof nothing els, Jun 19, 2025).
How do I get alerts for new permits at 1336 Maureen Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75232- 1412 Brook Valley LnDec 5, 2025Gas repair/relay and gas test · 166 m away
- 1327 Drury DrFeb 27, 2026Gas pressure test only no repair · 177 m away
- 1239 Brook Valley LnJun 19, 2025Re roof nothing els · 179 m away
- 1229 Brook Valley LnSep 22, 2025Electric service repair dues to weather conditions · 192 m away
- 1208 Gregory DrJun 22, 2026Inspection for gas to be turned on by atmos · 200 m away
- 1459 Oak Vista DrJul 27, 2026We are making a repair to the gas riser on the home side of the gas meter · 201 m away
- 1318 Naples DrOct 26, 2020Replace or modify existing hvac · 207 m away
- 5220 Jade DrJun 10, 2025Re roof · 226 m away
- 1466 Oak Vista DrOct 5, 2026Gas pressure test · 226 m away
- 1404 Drury DrMay 20, 2025Service change.demolition existing electric service and install a new single phase 200 amp 120/240 volt main breaker panel.check branch circuit wiring and match proper sub breakersdemo existing a/c power and run new branch feeder for ac system.install supplementary ground electrode as needed · 235 m away
- 1410 Drury DrNov 10, 2026Roof replacement · 238 m away
- 1429 Brook Valley PlJun 4, 2025New gas service · 239 m away