1817 Altadena Ln
Dallas, TX 75232
30-foot sewer tunnel repair permitted at 1817 Altadena Ln
A residential permit records a 30-foot sewer tunnel repair at 1817 Altadena Ln. The City of Dallas permit was filed on December 9, 2025; the record does not list a project cost or construction schedule.
Summarized from City of Dallas records · updated Dec 9, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 9, 2025
- since Dec 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1817 Altadena Ln
What work is permitted at 1817 Altadena Ln in Dallas?
A City of Dallas residential plumbing permit lists a 30-foot sewer tunnel repair at the address.
When was the sewer repair permit filed for 1817 Altadena Ln?
The permit was filed on December 9, 2025.
What is the permit number for 1817 Altadena Ln?
The City of Dallas permit number is RES-PLM-25-008596.
Is a new home being built at 1817 Altadena Ln?
The record provided is for a 30-foot sewer tunnel repair, not a new-home construction permit.
How much will the sewer tunnel repair at 1817 Altadena Ln cost?
The permit record does not report a project valuation or cost estimate.
When will work start at 1817 Altadena Ln?
The permit record does not provide a construction start date or schedule.
Also being built nearby
All of 75232- 1811 Altadena LnJun 2, 2026Replace 200 amp panel, meter base and main disconnect · 8 m away
- 7719 Indian Ridge TrlAug 9, 2025Replacing the condenser coil and furnace · 109 m away
- 1921 Egyptian DrNov 9, 2026Sewer repair by 55' tunnel & replace 50' sewer service · 144 m away
- 7728 Lost Mirage DrApr 24, 2026Installation of 2 tesla powerwall 3 batteries (13.5 kwh, 240v) to be integrated with an existing roof-mounted solar pv system · 160 m away
- 7737 Lost Mirage DrApr 3, 2026Nsfaa · 165 m away
- 1806 Dolores WayMay 4, 2026Mcr with battery (3rd) danny kinder - installation of a grid tied, roof mounted, solar pv systems and sonnencore+ score-p20 20kwh batteries and an mdu with a 3rd party reviewed plan set · 200 m away
- 7714 Oak Garden TrlAug 27, 2025Install a 7.740 kw roof mounted pv solar system, 18 panels. proposed work includes a tesla powerwall-3 and tesla energy gateway. utility shutdown needed to install tesla energy gateway-3 between the meter and new span panel · 201 m away
- 7635 Indian Ridge TrlOct 7, 2026Water heater traditional changeout · 204 m away
- 1710 Dolores WayDec 11, 2025Remove bent service riser and replace conductors · 205 m away
- 7629 Indian Ridge TrlAug 29, 2025Installation of a 20 modules - roofmounted - 8.200 kw dc, 5.760 kw ac with 1 solaredge home battery: bat-10k1p · 210 m away
- 7709 Oak Garden TrlMay 19, 2025Spot repair on main building sewer line in back yard · 216 m away
- 7803 Lost Mirage DrJun 10, 2026Hvac new build · 220 m away