1825 Meadow Valley Ln
Dallas, TX 75232
Permit filed to replace a 3-ton gas furnace
A residential mechanical permit filed October 30, 2025, covers replacement of a 3-ton gas furnace at 1825 Meadow Valley Ln. The City of Dallas record lists permit RES-MEC-25-003382.
Summarized from City of Dallas records · updated Oct 30, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 30, 2025
- since Oct 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1825 Meadow Valley Ln
What work is permitted at 1825 Meadow Valley Ln?
A City of Dallas residential mechanical permit covers replacement of a 3-ton gas furnace. The permit number is RES-MEC-25-003382.
When was the furnace replacement permit filed?
The permit was filed on October 30, 2025.
Is a new house being built at 1825 Meadow Valley Ln?
The available City of Dallas record is for replacing a gas furnace, not for new home construction.
What is permit RES-MEC-25-003382 for?
It is a residential mechanical permit to replace a 3-ton gas furnace at 1825 Meadow Valley Ln.
How many projects are listed for 1825 Meadow Valley Ln?
The records list one project: the furnace replacement permitted on October 30, 2025.
Also being built nearby
All of 75232- 1816 Meadow Valley LnSep 28, 2026Gas leak--3 leaks found 1 @ water heater 2 under the house · 25 m away
- 1810 Heather Glen DrNov 17, 2026Install 50 gallon gas water heater in hallway closet (swap out) · 64 m away
- 1855 Meadow Valley LnJul 7, 2026Re roofing replacement · 80 m away
- 1816 Heather Glen DrApr 15, 2026Removing existing shingles and replacing with new lifetime, architectural style shingles · 87 m away
- 1837 Heather Glen DrJul 23, 2026Replacing 50 gallon gas water heater · 98 m away
- 1860 Meadow Valley LnDec 30, 2025-replace/upgrade the existing electrical 125amp electrical panel.-relocate the branch circuits from the existing electrical panel to a new 125amp outdoor mcb panel located under the meter.-use the existing electrical panel can as a junction box for the extension of the branch circuits.-furnish and install a new 200amp electrical meter and riser to meet oncor requirements.-feed new riser with new 2/0 cu wire.-furnish and install standard breakers.-make all necessary connections and terminations · 99 m away
- 2011 Matagorda DrSep 22, 2020Install roof mounted solar pv system · 101 m away
- 2004 Matagorda DrNov 2, 2020Install fence · 112 m away
- 1928 Matagorda DrNov 19, 2025Gas test · 127 m away
- 1920 Matagorda DrNov 30, 2020Sewer relay · 131 m away
- 2117 Sea Island DrAug 29, 202525' sewerline under home · 169 m away
- 1731 Meadow Valley LnAug 21, 2026Complete hvac installation · 176 m away