1830 Goldwood Dr
Dallas, TX 75232
Elementary school renovation and kitchen addition at 1830 Goldwood Dr
Dallas permits filed March 26 and April 14, 2026, describe renovations to an existing public elementary school and an addition to expand its kitchen. Plans also include a secured main-entry vestibule, updates to the administration suite and media center, roof and window work, walkway canopies, and parking-lot repairs; the permit description says the site's use will not change.
Summarized from City of Dallas records · updated Apr 14, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 14, 2026
- since Mar 26, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsQteam interior renovation of existing public elementary school (grades pk-5th) and a building addition that will expand the kitchen. the interior renovation includes finish upgrades, lighting replacement, remodeled administration suite and media center, and the addition of a new secured vestibule at the main entry. additional work includes roof repair, window replacement, the addition of walkway canopies, new digital marquee sign, extended fire lane and repaired walkway/delivery parking lot concrete paving. this project will not change the use of the site/building
Qteam interior renovation of existing public elementary school (grades pk-5th) and a building addition that will expand the kitchen. the interior renovation includes finish upgrades, lighting replacement, remodeled administration suite and media center, and the addition of a new secured vestibule at the main entry. additional work includes roof repair, window replacement, the addition of walkway canopies, new digital marquee sign, extended fire lane and repaired walkway/delivery parking lot concrete paving. this project will not change the use of the site/building
City of Dallas permitCommercial Alteration Addition PermitDsst disd birdie alexander es interior renovation of existing public elementary school and a building addition that will expand the kitchen. the interior renovation includes finish upgrades, lighting replacement, remodeled administration suite and media center, and the addition of a new secured vestibule at the main entry. additional work includes roof repair, window replacement, the addition of walkway canopies, new digital marquee sign, extended fire lane and repaired walkway/delivery parking lot concrete paving
Dsst disd birdie alexander es interior renovation of existing public elementary school and a building addition that will expand the kitchen. the interior renovation includes finish upgrades, lighting replacement, remodeled administration suite and media center, and the addition of a new secured vestibule at the main entry. additional work includes roof repair, window replacement, the addition of walkway canopies, new digital marquee sign, extended fire lane and repaired walkway/delivery parking lot concrete paving
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 1830 Goldwood Dr
What is being built at 1830 Goldwood Dr in Dallas?
Permits describe renovations to an existing public elementary school and a building addition to expand its kitchen. The work also includes a secured entry vestibule and updates to school spaces and site features.
When were permits filed for work at 1830 Goldwood Dr?
The City of Dallas records show permits filed March 26, 2026 (COM-ALT-ADD-26-000710) and April 14, 2026 (COM-ALT-ADD-26-000895).
Is a new school being built at 1830 Goldwood Dr?
The permits describe renovations to an existing public elementary school, not a new school. The work includes an addition to expand the kitchen.
What improvements are planned for the elementary school on Goldwood Drive?
The permit descriptions include finish and lighting upgrades, a remodeled administration suite and media center, a secured vestibule, roof repairs, window replacement, and walkway canopies.
Will the project at 1830 Goldwood Dr change the building's use?
The April 14, 2026, permit description says the project will not change the use of the site or building.
Does the school project include parking or fire-lane work?
Yes. The permit descriptions include an extended fire lane and repairs to concrete paving in the walkway and delivery parking area.
Also being built nearby
All of 75232- 1830 Goldwood Drive · Dallas Independent School DistrictSep 12, 2024Disd-birdie alexander elementary school renovation & addition — additions to existing building — interior remodeling of elementary school administration suite, secured vestibule, staff breakroom, media center, kitchen and dining hall. expanded kitchen included in a building addition, and exterior improvements including sidewalks and canopies
- 1826 Brookterrace TrlApr 7, 2026Repair hot water leak via 5ft interior tunnel · 94 m away
- 1839 Brookterrace TrlSep 28, 2020Remove existing roof and install new roof · 111 m away
- 7617 Indian Ridge TrlOct 8, 2020Remodel existing plumbing · 177 m away
- 1816 Robingreen LnOct 19, 2026Gas test and replacing a gas isolation valve · 180 m away
- 1801 Robingreen LnJul 15, 2026Check plumbing pressure · 185 m away
- 7629 Indian Ridge TrlAug 29, 2025Installation of a 20 modules - roofmounted - 8.200 kw dc, 5.760 kw ac with 1 solaredge home battery: bat-10k1p · 187 m away
- 7635 Indian Ridge TrlOct 7, 2026Water heater traditional changeout · 192 m away
- 1821 Robingreen LnOct 2, 2025Break out concrete and tunnel approx. 10' totub waste. replace tub waste and overflow · 194 m away
- 7554 Oak Garden TrlMar 9, 2026Install 8 pilings · 222 m away
- 7624 Oak Garden TrlJul 28, 202531 ft below the slab and 50 ft in the yard · 240 m away
- 1655 Oak Glen TrlOct 9, 20258 feet long wood fence side by side · 295 m away
More parking structures in 75232, restaurants in 75232, schools & daycares in 75232.