groundranger
Recent · latest filing Jul 2026Residential

311 Glen Oaks Blvd

Dallas, TX 75232

Permits cover home batteries and a 20 kW generator

Residential permits at 311 Glen Oaks Blvd cover additions of home batteries to an existing solar system and installation of a 20 kW generator. The battery permits were filed from July 2025 through May 2026, and the generator permit was filed July 28, 2026.

Summarized from City of Dallas records · updated Jul 28, 2026

Projects
4
4 filings
Latest filing
Jul 28, 2026
since Jul 10, 2025
Largest scope
—
Listed value
—

Permit & project history

4 projects
  1. Install 20kw cummings generator

    Install 20kw cummings generator

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-004476
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Mcr with battery residential whole home battery - solar was previously installed, just installing 1 home battery to existing solar

    Mcr with battery residential whole home battery - solar was previously installed, just installing 1 home battery to existing solar

    City of Dallas permitResidential Solar/PV Permit
    Record
    RES-SOLAR-25-000651
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Addition of 1 residential home battery

    Addition of 1 residential home battery

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-004327
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Residential whole home battery back up - solar is already installed and closed out with inspection, this is just for a battery addition. roof will not change, only the electrical

    Residential whole home battery back up - solar is already installed and closed out with inspection, this is just for a battery addition. roof will not change, only the electrical

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-001334
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 311 Glen Oaks Blvd

What is being built at 311 Glen Oaks Blvd?

Permits indicate additions of home batteries to an existing solar system and installation of a 20 kW generator. They are residential permits, not permits for a new building.

Is a new solar system being installed at 311 Glen Oaks Blvd?

The permits describe batteries being added to solar that was already installed. They do not describe a new solar installation.

When were the home battery permits filed?

Battery-related permits were filed July 10, 2025 (RES-ELC-25-001334), November 6, 2025 (RES-ELC-25-004327), and May 19, 2026 (RES-SOLAR-25-000651).

Is a generator being installed at 311 Glen Oaks Blvd?

Yes. A City of Dallas residential electrical permit filed July 28, 2026, describes installation of a 20 kW generator (RES-ELC-26-004476).

What is the latest permit for 311 Glen Oaks Blvd?

The latest record in the supplied permits is dated July 28, 2026. It covers installation of a 20 kW generator under permit RES-ELC-26-004476.

Are the permits for a new home at 311 Glen Oaks Blvd?

The records describe electrical work, home battery additions, and a generator at a residence. They do not describe construction of a new home.

Also being built nearby

All of 75232

More solar installs in 75232.

Get alerts for 311 Glen Oaks Blvd