521 Highcrest Dr
Dallas, TX 75232
521 Highcrest Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 521 Highcrest Dr, Dallas, TX 75232. The most recent, filed August 14, 2025, covers: “Reroof main house only”.
Compiled from City of Dallas records · updated Aug 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 14, 2025
- since Aug 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 521 Highcrest Dr
What is being built at 521 Highcrest Dr?
The latest filing (City of Dallas permit RES-ROOF-25-000682, August 14, 2025) covers reroof main house only.
How many permits and filings does 521 Highcrest Dr have?
1 filing across 1 project, from August 14, 2025 to August 14, 2025.
Is there other construction near 521 Highcrest Dr?
Yes. Nearby filings include 520 Highcrest Dr (no power replace 125 amp panel, meter base and riser; add surge protection and grounding, Aug 6, 2025); 506 Highcrest Dr (gas test only, May 4, 2026); 6911 Coleshire Dr (whole home drain repipe under home. part of the drain will be re-piped around home, Sep 11, 2026).
How do I get alerts for new permits at 521 Highcrest Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75232- 520 Highcrest DrAug 6, 2025No power replace 125 amp panel, meter base and riser; add surge protection and grounding · 13 m away
- 506 Highcrest DrMay 4, 2026Gas test only · 20 m away
- 6911 Coleshire DrSep 11, 2026Whole home drain repipe under home. part of the drain will be re-piped around home · 86 m away
- 6914 Greenspan AveJun 27, 2025Set kohler acrylic tub 60x30. set valve · 89 m away
- 428 Highcrest DrJun 1, 2026Replacing approx 80ft of gas line · 98 m away
- 6928 Coleshire DrJul 30, 2026Gas test and repair gas leak in attic · 104 m away
- 420 Highcrest DrJul 20, 2026Elec meter release secure meter · 105 m away
- 425 Highcrest DrNov 11, 2025Gas test · 107 m away
- 6809 Coleshire DrNov 18, 2025Mcr with battery installation of 8.61kw roof-mounted pv system with 21 modules, 1 inverter & 1 battery · 113 m away
- 415 Highcrest DrMay 14, 202512 ft tunnel by 3 ft deep water leak repair under slab house 1/2 copper to 1/2 copper under restroom · 117 m away
- 405 Highcrest DrFeb 17, 2026Replacing all cast iron under slab with sch 40 pvc · 126 m away
- 538 Highfall DrOct 15, 2026Gas test / repair · 131 m away