540 Kirnwood Dr
Dallas, TX 75232
Gas pressure test filed at 540 Kirnwood Dr
A residential plumbing permit for a gas pressure test was filed at 540 Kirnwood Dr on November 5, 2025. The record does not describe a new building or specify additional work.
Summarized from City of Dallas records · updated Nov 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2025
- since Nov 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 540 Kirnwood Dr
What is being built at 540 Kirnwood Dr in Dallas?
The City of Dallas record is for a residential gas pressure test, not a new building. The permit was filed November 5, 2025.
What work is the permit for at 540 Kirnwood Dr?
Permit RES-PLM-25-007054 describes a gas pressure test under a residential plumbing permit.
When was the permit filed for 540 Kirnwood Dr?
The City of Dallas permit was filed on November 5, 2025.
Is a new home being built at 540 Kirnwood Dr?
The available permit record does not indicate new home construction. It describes a gas pressure test.
What is permit RES-PLM-25-007054 in Dallas?
It is a City of Dallas residential plumbing permit for a gas pressure test at 540 Kirnwood Dr, filed November 5, 2025.
Also being built nearby
All of 75232- 509 E Kirnwood DrMay 19, 2026Installation of solar panels onto existing residential roof. 6.16 kw, 14 panels. 30a breaker in sub panel · 57 m away
- 574 Kirnwood DrNov 3, 2025Sewer relay and repair on sewer under home · 82 m away
- 527 Kirnwood PlJun 4, 2026Installation of a tesla powerwall 3 battery addition - 13.500 kwh capacity · 84 m away
- 586 Kirnwood DrSep 4, 2025Gas test of all fixtures outlets · 124 m away
- 7862 Robincreek DrOct 14, 2025Gas test · 153 m away
- 7711 Leigh Ann DrJul 8, 2025Gas test · 154 m away
- 522 Glencairn DrAug 28, 2026Changing roof · 177 m away
- 7807 Greenspan AveSep 28, 2026Replace 4 ton complete gas system · 180 m away
- 514 Glencairn DrOct 7, 2025We are performing a gas test for atmos to renew service · 180 m away
- 7717 Greenspan AveJun 17, 2026No work done need electrical release no work is being performed there · 200 m away
- 460 Glencairn DrOct 20, 2020Foundation repair · 212 m away
- 7824 Greenspan AveJun 17, 2025Water line replacement from city meter to shut off valve for home · 213 m away