5406 Longleaf Ln
Dallas, TX 75232
5406 Longleaf Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 5406 Longleaf Ln, Dallas, TX 75232. The most recent, filed June 3, 2025, covers: “Remove and replace 1 full hvac system”.
Compiled from City of Dallas records · updated Jun 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 3, 2025
- since Jun 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5406 Longleaf Ln
What is being built at 5406 Longleaf Ln?
The latest filing (City of Dallas permit RES-MEC-25-000513, June 3, 2025) covers remove and replace 1 full hvac system.
How many permits and filings does 5406 Longleaf Ln have?
1 filing across 1 project, from June 3, 2025 to June 3, 2025.
Is there other construction near 5406 Longleaf Ln?
Yes. Nearby filings include 5421 Longleaf Ln (gas line replacement, Mar 24, 2026); 5427 Longleaf Ln (replace existing hvac indoor evap coil and outdoor condenser unit, Jun 24, 2025); 615 Meadow Heath Cir (gas test + repairs - gas meter is locked, Aug 15, 2025).
How do I get alerts for new permits at 5406 Longleaf Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75232- 5421 Longleaf LnMar 24, 2026Gas line replacement · 21 m away
- 5427 Longleaf LnJun 24, 2025Replace existing hvac indoor evap coil and outdoor condenser unit · 27 m away
- 615 Meadow Heath CirAug 15, 2025Gas test + repairs - gas meter is locked · 74 m away
- 623 Meadow Heath CirSep 25, 202530' sewer line replaced under home · 74 m away
- 5423 Cherry Glen LnSep 4, 2025Gas testing · 92 m away
- 5441 Cherry Glen LnFeb 19, 2026Excavate a tunnel underneath the home on the left side of the property to replace approximately 30-35 foot of damaged cast iron sewage piping. perform hydrostatic testing and backfill upon completion · 102 m away
- 5312 Oak TrlOct 19, 2026Trench from the edge of the house where the restrooms come out all the way to the city and reroute the sewer line · 107 m away
- 5515 Longleaf LnNov 20, 2025Gas test · 130 m away
- 714 Green Hill RdJul 2, 2025Gas water heater rreplacement · 131 m away
- 5520 Oak TrlOct 22, 2025Electrical repairs from home inspection · 178 m away
- 815 Clear Fork DrNov 4, 2026Main panel upgrade · 179 m away
- 814 Clear Fork DrJun 3, 2026Replace building sewer in crawlspace · 185 m away