655 Shadyway Dr
Dallas, TX 75232
655 Shadyway Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 655 Shadyway Dr, Dallas, TX 75232. The most recent, filed September 4, 2025, covers: “Dig 6 foot pit at city dig 45 feet sewer line in front yard cut out 5 footof concrete at house install new sewer line ten year warrantypayment”.
Compiled from City of Dallas records · updated Sep 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 4, 2025
- since Sep 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectDig 6 foot pit at city dig 45 feet sewer line in front yard cut out 5 footof concrete at house install new sewer line ten year warrantypayment
Dig 6 foot pit at city dig 45 feet sewer line in front yard cut out 5 footof concrete at house install new sewer line ten year warrantypayment
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 655 Shadyway Dr
What is being built at 655 Shadyway Dr?
The latest filing (City of Dallas permit RES-PLM-25-004429, September 4, 2025) covers dig 6 foot pit at city dig 45 feet sewer line in front yard cut out 5 footof concrete at house install new sewer line ten year warrantypayment.
How many permits and filings does 655 Shadyway Dr have?
1 filing across 1 project, from September 4, 2025 to September 4, 2025.
Is there other construction near 655 Shadyway Dr?
Yes. Nearby filings include 659 Shadyway Dr (replace 3 ton complete gas system, Sep 24, 2026); 7932 Silverdale Dr (replace 40 gallon gas water heater in garage, Feb 25, 2026); 620 Shadyway Dr (nsfaareplace 2 windows(like for like) and 1 door- construction header job. job must be installed per structural engineer drawings enlarging opening to accommodate a 14 foot door, Jan 8, 2026).
How do I get alerts for new permits at 655 Shadyway Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75232- 659 Shadyway DrSep 24, 2026Replace 3 ton complete gas system · 10 m away
- 7932 Silverdale DrFeb 25, 2026Replace 40 gallon gas water heater in garage · 89 m away
- 620 Shadyway DrJan 8, 2026Nsfaareplace 2 windows(like for like) and 1 door- construction header job. job must be installed per structural engineer drawings enlarging opening to accommodate a 14 foot door · 108 m away
- 7916 Silverdale DrApr 21, 2026Re roof and deck · 114 m away
- 721 Edgedale DrJun 9, 2026Sewer lie replacement · 119 m away
- 626 Seaside DrAug 4, 2026Re roof · 124 m away
- 712 Edgedale DrApr 27, 2026Service repair · 126 m away
- 625 Seaside DrAug 13, 2025We are replacing three faucets, two toilets, a tub and tub valve, a shower valve, a garbage disposal, ice maker box, washer box, and a gas water heater. we are converting a tub into a shower. we are performing a gas test and making any necessary repairs · 127 m away
- 621 Seaside DrMar 15, 2026Meter base change · 133 m away
- 646 Edgedale DrOct 20, 2025Installation of a 11 modules - roof mounted - 4.510 kw dc, 3.190 kw ac with 1 enphase encharge iqbattery-5p-1p-na (5.0 kwh) and a 200a main panel upgrade · 133 m away
- 7904 Silverdale DrJun 8, 2026Sewer line reroute, tunnel under home to expose back bathrooms, trench along back and left of home into main sewer. also redirect kitchen and laundry lines, waste rise of wall and tie into main sewer line. all exposed cast iron being replaced with schedule 40 pvc and supported with pipe hangers every 4ft · 145 m away
- 622 Edgedale DrAug 21, 20262.5 ton basic gas system · 172 m away