823 Misty Glen Ln
Dallas, TX 75232
5-ton HVAC system replacement permitted at 823 Misty Glen Ln
A 5-ton gas upflow HVAC system replacement was permitted at this residence on October 13, 2025, under Dallas permit RES-MEC-25-003082. A separate sewer relay permit was filed for the address in 2020.
Summarized from City of Dallas records · updated Oct 13, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 13, 2025
- since Oct 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 823 Misty Glen Ln
What work was permitted at 823 Misty Glen Ln?
A City of Dallas permit covers replacement of a 5-ton gas upflow HVAC system. The permit was filed October 13, 2025, as RES-MEC-25-003082.
When was the HVAC replacement permit filed?
The City of Dallas filed permit RES-MEC-25-003082 on October 13, 2025.
Is new construction planned at 823 Misty Glen Ln?
The records provided show a residential HVAC replacement permit and an earlier sewer relay permit, not a new-construction permit.
Was plumbing work permitted at 823 Misty Glen Ln?
A sewer relay was permitted on February 18, 2020, under City of Dallas permit 2002183064.
What is being worked on near Dallas ISD at 724 Green Cove Lane?
At 823 Misty Glen Ln, about 226 meters from the listed Dallas ISD address, a 5-ton HVAC system replacement was permitted in October 2025.
Also being built nearby
All of 75232- 811 Misty Glen LnApr 16, 2026Install 50 gallon gas water heater in laundry room (swap out) · 31 m away
- 853 Misty Glen LnOct 19, 2026Remodel plumbing · 77 m away
- 808 Whitestone LnAug 5, 2026Remove existing roof down to the sheathing and install new asphalt shingles with new accessories/flashing as needed · 91 m away
- 872 Misty Glen LnApr 23, 2026Remove and replace sewer main 35 lf · 130 m away
- 846 Green Cove LnOct 15, 2026Hvac replacement3.5 ton complete systemgas horizontalcarrier comfort · 139 m away
- 838 Green Cove LnMay 22, 2025Replace water line · 141 m away
- 816 Green Cove LnDec 16, 2025Customer is hiring me to pull a permit for gas test. gas meter has been removed. the customer would like a new gas line from the meter to the house. he would also like to run new csst line to the furnace and the water heater · 145 m away
- 918 Whitestone LnOct 5, 2026Erie to remove existing roofing and properly dispose. erie to furnish and installice and water shield where applicable.erie to furnish and install fiberglass dimensional shingle.erie to furnish and install all accessories that may include drip edge, pipe boots,and flashing.erie to vent roof properly.erie to furnish and install premium synthetic underlayment · 166 m away
- 905 Green Cove LnJan 8, 2026Replaced gas riser that got hit · 170 m away
- 4728 Oak TrlDec 15, 2020Remove existing roof and install new roof · 174 m away
- 4719 Oak TrlOct 5, 2020Gas relay or repair with test · 179 m away
- 4706 Oak TrlOct 1, 2026Gas repair · 194 m away