8601 Willoughby Blvd
Dallas, TX 75232 · Dallas ISD
Martin Weiss Elementary plans entry addition and interior upgrades
A registered project at Martin Weiss Elementary School lists an administrative suite addition at the main entrance, interior renovations, and site improvements. The Texas Department of Licensing and Regulation registration was filed February 25, 2026, and gives an estimated project cost of $8,268,282.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 25, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 25, 2026
- since Feb 25, 2026
- Largest scope
- 70,210 sf
- Estimated cost
- $8.3M
- state registration
Where this project stands
In state plan reviewOrg 226 Martin Weiss Elementary School
70,210 sq ft · $8.3M est.
- RegisteredFeb 25, 2026
- Plan reviewnow
- ConstructionJun '26 – Dec '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectAdmin suite addition at main entry, including site improvements along front of the school. interior renovations focusing on corridors, adjustments to water coolers, window replacement, lighting/controls, and gym flooring. site work for new fire lane. — martin weiss elementary school
TDLR project registrationAdditions to Existing BuildingProject Registered70,210 sq ft$8.3M est.- Project #
- TABS2026013483
- Tenant / owner
- Org 226 Martin Weiss Elementary School
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 8601 Willoughby Blvd
What is being built at 8601 Willoughby Blvd?
A Texas Department of Licensing and Regulation registration lists an administrative suite addition at Martin Weiss Elementary School, along with interior renovations and site work. The project was registered February 25, 2026.
Is Martin Weiss Elementary School getting an addition?
Yes. The project registration describes an administrative suite addition at the school's main entrance.
What renovations are planned at Martin Weiss Elementary School?
The registration lists corridor renovations, water cooler adjustments, window replacement, lighting and controls work, and new gym flooring.
Will the Martin Weiss Elementary project include site work?
Yes. The registered scope includes improvements along the front of the school and work for a new fire lane.
When was the Martin Weiss Elementary School project filed?
The project was registered with the Texas Department of Licensing and Regulation on February 25, 2026. Its registration number is TABS2026013483.
How much will the Martin Weiss Elementary project cost?
The TDLR registration lists an estimated project cost of $8,268,282. This is the applicant's estimate, not a confirmed final cost.
Also being built nearby
All of 75232- 8778 Willoughby BlvdJul 22, 2025Install electrical service for a charter power supply cabinet that was hit by car {currently on a generator.} · 39 m away
- 8502 Willoughby BlvdOct 9, 2025Cope of work: shingles-remove existing shingles down to the wood deck-assess deck for any rotten or damaged decking-re-nail any loose decking-furnish and install 3' polyglass self-adhered ice and water shield at all valleys and perimeters-furnish and install gaf quix synthetic underlayment-furnish and install gaf prostart starter shingles along rake edges and gutter lines-furnish and install pabco premier weathered wood class 3 architectural shingles per manufacturesspecifications.-furnish and install pabco supreme weathered wood hip and ridge shingles-furnish and install new 1.5"x1.5" a style drip edge to match shingles-install new ventilation-install new pipe and chimney flashings-clean up all work related debris daily-lifetime workmanship and manufacture warranty included-daily reports will be sent detailing the previous days work-3rd party safety consultant will be present to maintain ohsa approved requirements duringconstruction-all equipment, dumpsters, porta potty, and supervision included-remove and dispose of existing gutters and downspouts-furnish and install new 5' aluminum seamless gutters. (color to be selected by owner)-install new downspoutsscope of work: single ply-tear of existing roof (2 roofs - top, 50mil durolast and fan fold - 3 ply bur with rock and perlite insulation)-assess decking for any rotten or damaged decking-furnish and install 2 layers (staggered) of 2.2" iso per code mechanically fastened-furnish and install new 60mil tpo per manufactures standards, mechanically fastened-furnish and install new wood blocking to perimeter to adjust to new insulation height-furnish and install new edge metal detail (color to be chosen by owner)-all penetrations will be flashed per manufactures standards-daily reports will be sent detailing the previous days work-3rd party safety consultant will be present to maintain ohsa approved requirements duringconstruction-all equipment, dumpsters, porta potty, and supervision included · 105 m away
- 8328 Willoughby BlvdOct 6, 2026Meter base repair/lug replacement in apartment 1203 · 269 m away
- 8206 Willoughby BlvdAug 5, 2025Add 2 circuits for main gates opener( 1 for each main gate motor) · 384 m away
- 8844 Winterset AveNov 5, 2025Gas repair at furnace with test · 403 m away
- 8839 Winterset AveOct 15, 2026Mcr with battery 11kw pv system with battery · 405 m away
- 8904 Cottonvalley RdSep 17, 2020Install solar panels to existing residential roof · 414 m away
- 447 W Wheatland RdSep 24, 2026Installation of a data cabinet for fiber optic line · 423 m away
- 8839 Beckley View AveApr 17, 202635 ft water service line replacement from meter to house · 484 m away
- 8922 Beckley View AveJun 26, 2025Install mechanical for new construction · 515 m away
- 8921 Beckley View AveJan 15, 2021Service release no work · 520 m away
- 623 Seabeach RdFeb 13, 2026Service repair only · 540 m away