943 Deerwood Dr
Dallas, TX 75232
Electrical service upgrade permitted at 943 Deerwood Dr
A residential electrical service upgrade was permitted at 943 Deerwood Dr in Dallas on September 18, 2026. The City of Dallas permit record describes the work as a “Service upgrade.”
Summarized from City of Dallas records · updated Sep 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 18, 2026
- since Sep 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 943 Deerwood Dr
What is being done at 943 Deerwood Dr in Dallas?
A City of Dallas residential electrical permit records a service upgrade at the address on September 18, 2026.
Was electrical work permitted at 943 Deerwood Dr?
Yes. The City of Dallas issued permit RES-ELC-26-005778 for a residential electrical service upgrade, filed September 18, 2026.
When was the service upgrade at 943 Deerwood Dr permitted?
The permit was filed on September 18, 2026.
What is permit RES-ELC-26-005778 for?
It is a City of Dallas residential electrical permit for a service upgrade at 943 Deerwood Dr.
Is a new building planned at 943 Deerwood Dr?
The available record is for a residential electrical service upgrade; it does not describe a new building.
How much will the work at 943 Deerwood Dr cost?
The permit record does not report a project valuation or estimated cost.
Also being built nearby
All of 75232- 923 Deerwood DrJun 25, 2026Replace cast-iron with pvc sewer line · 38 m away
- 908 Deerwood DrSep 23, 2020Gas relay or repair with test · 66 m away
- 903 Deerwood DrOct 15, 2020Install water heater · 76 m away
- 1026 Clearwood DrAug 11, 2026Mechanical change out · 94 m away
- 930 Emberwood DrSep 12, 2025Replace 3 ton complete gas system · 110 m away
- 1015 Clearwood DrApr 28, 2026Replace roofing shingles · 115 m away
- 923 Clearwood DrDec 29, 2023Adding second level to property · 115 m away
- 7305 Woodshire DrAug 13, 2025Replacing meterbase, relocating existing closet panel, installing new 200 amp panel outside with main breaker, updating the grounding & surge protection, installing a new overhead service · 121 m away
- 7325 Woodshire DrJul 22, 202515 ft tunnel to repair water leak under the house · 124 m away
- 928 Clearwood DrNov 24, 2020New drive approach · 137 m away
- 904 Clearwood DrJun 30, 2026Gas test · 170 m away
- 7415 Woodshire DrJun 24, 2026Reroof home removing all existing materials to decking and installing all new materials · 170 m away