2410 W Illinois Ave
Dallas, TX 75233
Meter replacement and plumbing work at 2410 W Illinois Ave
Dallas permits show plumbing work and an electrical meter replacement at 2410 W Illinois Ave, rather than a documented new building. Plumbing permits were filed August 15 and October 29, 2025, and an electrical permit for replacing the meter was filed July 22, 2026.
Summarized from City of Dallas records · updated Jul 22, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jul 22, 2026
- since Aug 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 2410 W Illinois Ave
What is happening at 2410 W Illinois Ave in Dallas?
City of Dallas permits list plumbing work, including a leak check and grease trap installation, and an electrical meter replacement. The records do not describe a new building.
What was permitted at 2410 W Illinois Ave?
A plumbing permit for a leak check was filed August 15, 2025 (COM-PLM-25-001219), followed by a grease trap permit on October 29, 2025 (COM-PLM-25-002299). An electrical permit for replacing the meter was filed July 22, 2026 (COM-ELC-26-003268).
Is a new building being built at 2410 W Illinois Ave?
The available City of Dallas records describe plumbing and electrical work, not construction of a new building.
When was the meter replacement permitted at 2410 W Illinois Ave?
The City of Dallas filed commercial electrical permit COM-ELC-26-003268 on July 22, 2026. Its description says the work is replacing the meter.
What plumbing work was permitted at 2410 W Illinois Ave?
The records list a leak check under permit COM-PLM-25-001219, filed August 15, 2025, and a grease trap installation under COM-PLM-25-002299, filed October 29, 2025.
Also being built nearby
All of 75233- 2302 W Illinois AveNov 21, 2025Gas test , existing gas pipes. needing gas release · 102 m away
- 2323 W Illinois AveJul 20, 2026Pharmacy remodel · 118 m away
- 2478 W Illinois AveJan 15, 2026Installing electrical for new vent-a-hood · 128 m away
- 2588 Hollywood AveOct 2, 2020Electric service for traffic signals · 172 m away
- 2701 S Hampton RdApr 27, 2026Replace backflow · 191 m away
- 2317 Mountain Lake RdNov 2, 2026Replace wiring that was stolen from the meter base electrical panel and interior home runs · 204 m away
- 2309 Mountain Lake RdAug 12, 2026Gas test is holding · 211 m away
- 2330 Engle AveAug 24, 2026Panel replacement · 229 m away
- 2531 Mountain Lake RdSep 17, 2026Nsfaa addition of 540 sq ft to existing home. adding 1 bedroom, 1 bathroom, plus storage space. construction to be wood frame on slab on grade · 266 m away
- 2509 Engle AveSep 18, 2025Nsfaa-addition of 240 square feet storage · 268 m away
- 2202 Engle AveAug 14, 2025Gas pressure test · 277 m away
- 2514 Engle AveMay 8, 2026Removing all old and damaged shingles and any decking/plywood that’s damaged under shingles but mainly just removing and replacing roofing shingles with new materials · 290 m away