2443 W Five Mile Pkwy
Dallas, TX 75233
Home repairs recorded at 2443 W Five Mile Pkwy
City of Dallas records show foundation repair, plumbing replacement and roof replacement at 2443 W Five Mile Pkwy. The permits were filed on December 7, 2020, August 18, 2025, and June 9, 2026; the records do not describe a new building.
Summarized from City of Dallas records · updated Jun 9, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jun 9, 2026
- since Dec 7, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 2443 W Five Mile Pkwy
What is being built at 2443 W Five Mile Pkwy?
The records describe repairs at the property, not a new building: foundation repair, plumbing replacement and roof replacement.
Is there a new construction project at 2443 W Five Mile Pkwy?
The three City of Dallas records provided do not describe new construction. They cover foundation, plumbing and roof repairs.
What work was permitted at 2443 W Five Mile Pkwy?
The permits cover foundation repair, replacement of leaking plumbing under the slab and yard line, and roof replacement.
When was the roof permit filed at 2443 W Five Mile Pkwy?
The City of Dallas roof replacement permit, RES-ROOF-26-000862, was filed on June 9, 2026.
When was plumbing work permitted at 2443 W Five Mile Pkwy?
The City of Dallas plumbing permit, RES-PLM-25-003819, was filed on August 18, 2025, for replacing leaking plumbing under the slab and a yard line.
Was foundation repair permitted at 2443 W Five Mile Pkwy?
Yes. City of Dallas permit 2012011111, filed on December 7, 2020, describes foundation repair.
Also being built nearby
All of 75233- 2446 Five Mile CirOct 14, 2025Mcr pool and spa design summary:main pool: 30 ft × 10 ft rectangular designintegrated spa: 7 ft × 7 ft, built inside the main pool structurefeature: raised spa with a spillover waterfall into the main pooloptional feature: water slide flowing into the main pool · 65 m away
- 2466 Five Mile CirJan 27, 2021Sewer relay · 66 m away
- 2442 Five Mile CirNov 7, 2025Gas test to restore service to the home · 67 m away
- 2470 Five Mile CirMay 27, 2026Whole home sewer repipe and mainline in front yard. the main line is 20ft and the drains in the house are 180 ft for a total of 200 ft. fresh water pipe with service replacement · 68 m away
- 2473 W Five Mile PkwyAug 15, 2025Panel upgrade · 98 m away
- 2422 W Kiest BlvdDec 22, 2020Erect attached sign · 162 m away
- 2426 W Kiest BlvdJan 15, 2021Erect attached sign · 162 m away
- 2434 W Kiest BlvdDec 16, 2020Erect attached sign · 162 m away
- 2436 W Kiest BlvdAug 14, 2025Replace a damage 50 gallon grease interceptor · 162 m away
- 2440 W Kiest BlvdDec 16, 2020Erect attached sign · 163 m away
- 2446 W Kiest BlvdJan 4, 2021Erect attached sign · 163 m away
- 2454 W Kiest BlvdDec 29, 2020Erect attached sign · 164 m away