3918 Oak Arbor Dr
Dallas, TX 75233
Partial sewer repipe permitted at 3918 Oak Arbor Dr
A partial sewer repipe is planned at 3918 Oak Arbor Dr in Dallas. The City of Dallas issued a residential plumbing permit on August 5, 2026; the permit does not state the project’s scope beyond a partial sewer repipe.
Summarized from City of Dallas records · updated Aug 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 5, 2026
- since Aug 5, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3918 Oak Arbor Dr
What work is planned at 3918 Oak Arbor Dr?
A City of Dallas residential plumbing permit describes a partial sewer repipe. It does not provide further details about the work.
When was the sewer repipe permitted at 3918 Oak Arbor Dr?
The permit was filed on August 5, 2026.
What is the permit number for 3918 Oak Arbor Dr?
The City of Dallas permit number is RES-PLM-26-008129, filed August 5, 2026.
Is a new home being built at 3918 Oak Arbor Dr?
The record is for a residential plumbing permit describing a partial sewer repipe, not a new-home construction permit.
What does a partial sewer repipe at 3918 Oak Arbor Dr involve?
The permit description only says “Partial sewer repipe.” It does not specify which pipes or areas of the home are involved.
Also being built nearby
All of 75233- 3905 Oak Arbor DrFeb 5, 2026Water heater install · 23 m away
- 4006 Oak Arbor DrMay 7, 2026This option is to create a 4 x 4 access hole in the backyard to tunnel underneath home 5 feet. this will allow us to replace all the cast-iron/pvc for three bathrooms, kitchen and laundry. once removing all plumbing underneath the home, we will install schedule 40 pvc pipe. after installing the new pvc pipe every 4 feet we will install hangers to ensure that the pipe is supported to the wood beam, but also ensure that the plumbing has a proper fall · 120 m away
- 4021 Oak Arbor DrAug 12, 2025Gas test · 140 m away
- 4063 Altoona DrSep 30, 2020Electrical repairs · 147 m away
- 4043 Oak Arbor DrDec 30, 2025Replaced hot water heater with electric tankless water heater. gas test required to reconnect gas line · 170 m away
- 3920 Shady Hollow LnApr 28, 2026Demolish structure & remove debrisno protected trees will be removed or disturbed · 187 m away
- 4115 Telstar DrJul 16, 20265-ton condenser with 100k btus furnace changeout · 213 m away
- 4016 Altoona DrMay 28, 2025Install new exterior main breaker assembly 125 amp due to existing one having burnt out wiring and lugs. please call michael if any ?s arise 8178225771 · 219 m away
- 4014 Altoona DrNov 10, 2025Repair svc meter base wiring and exterior main breaker 150a please call michael if any issues 8178225771 · 223 m away
- 3914 Pictureline CirJun 9, 2026Replacing drain lines under the house and the service · 235 m away
- 4103 Oak Arbor DrJan 2, 2026Install gas yard line relay with gas test · 250 m away
- 4107 Oak Arbor DrJul 15, 2026Remove old roofing materials and replace with new roof system · 255 m away