Recent · latest filing Jun 2026Residential

11827 High Meadow Dr

Dallas, TX 75234

Home battery storage added to existing rooftop solar

Permits indicate a residential battery storage system is being installed at 11827 High Meadow Dr alongside an existing rooftop solar array. A solar/PV permit was filed January 2, 2026, and an electrical permit for an energy storage system was filed June 23, 2026.

Summarized from City of Dallas records · updated Jun 23, 2026

Projects
2
2 filings
Latest filing
Jun 23, 2026
since Jan 2, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Luis rivas- energy storage system (ess) for a residential installation. plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with texas local government code chapter 247 (sb 1202), including stamped plans and letter of compliance

    Luis rivas- energy storage system (ess) for a residential installation. plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with texas local government code chapter 247 (sb 1202), including stamped plans and letter of compliance

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-003691
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Mcr with battery battery installation-duracell max hybrid 15 - 40 kwh onto existing 23 roof panels solar system approx 9.32kw

    Mcr with battery battery installation-duracell max hybrid 15 - 40 kwh onto existing 23 roof panels solar system approx 9.32kw

    City of Dallas permitResidential Solar/PV Permit
    Record
    RES-SOLAR-26-000001
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 11827 High Meadow Dr

What is being built at 11827 High Meadow Dr?

City of Dallas permits indicate a residential battery storage system is being installed alongside an existing rooftop solar array. The June 23, 2026, electrical permit is RES-ELC-26-003691.

Is a new solar system being installed at 11827 High Meadow Dr?

The January 2, 2026, solar/PV permit, RES-SOLAR-26-000001, describes a battery installation onto an existing solar system with 23 roof panels and an approximate capacity of 9.32 kW.

When was the battery installation permitted?

A solar/PV permit was filed January 2, 2026, and an electrical permit for an energy storage system was filed June 23, 2026.

What kind of battery is listed in the permit?

The January 2, 2026, permit describes a Duracell Max Hybrid 15 battery with 40 kWh of capacity.

Is the home battery project near Cici's Pizza on Forest Lane?

The project address is about 240 meters from Cici's Pizza at 3128 Forest Lane. The permits describe residential solar and battery work at 11827 High Meadow Dr.

Also being built nearby

All of 75234

More warehouses & industrial in 75234, solar installs in 75234.

Get alerts for 11827 High Meadow Dr