3029 Forest Lane
Dallas, TX 75234 · Grace Revolution Church
59,770-square-foot building planned for church use
A 59,770-square-foot existing building at 3029 Forest Lane is planned for alteration to church use. The TDLR project registration for Grace Revolution Church was filed June 2, 2025, and lists an applicant-estimated project cost of $14 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 2, 2025
- since Jun 2, 2025
- Largest scope
- 59,770 sf
- Estimated cost
- $14M
- state registration
Where this project stands
Finishing up · inspection nextGrace Revolution Church
59,770 sq ft · $14M est.
- RegisteredJun 2, 2025
- Plan review
- ConstructionJul '25 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectAlteration of an existing building to church use. — grace revolution church
TDLR project registrationRenovation/AlterationReview Complete59,770 sq ft$14M est.- Project #
- TABS2025020263
- Tenant / owner
- Grace Revolution Church
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3029 Forest Lane
What is being built at 3029 Forest Lane?
A TDLR registration describes an alteration of an existing 59,770-square-foot building for church use. It names Grace Revolution Church as the project.
When was the church project at 3029 Forest Lane permitted?
The TDLR project registration was filed June 2, 2025. Its status is listed as Review Complete.
What is the project number for Grace Revolution Church in Dallas?
The TDLR registration number is TABS2025020263. It was filed June 2, 2025.
How much will the church project at 3029 Forest Lane cost?
The TDLR registration lists an applicant-estimated cost of $14 million for the project. This is an estimate, not a confirmed final cost.
What is changing near Rubinfeld Investments on Forest Lane?
At 3029 Forest Lane, about 42 meters from Rubinfeld Investments at 2992 Forest Lane, a TDLR registration describes an existing building being altered for church use. The project is listed as Grace Revolution Church.
Also being built nearby
All of 75234- 3029 Forest LnJul 2, 20268 rtu's4 exhaust fans1 wall louver42 vav's4 unit heaters10 ductless mini split systemsductwork
- 2992 Forest Lane · Rubinfeld InvestmentsJul 15, 2024Pep boys dallas 761 — renovation/alteration — interior renovation of an existing pep boys · 42 m away
- 2968 Forest LnAug 13, 2024In house - quiktrip 903 - coffee wow phase 2.5 - updated millwork and equipment to existing coffee bar, install new drain manifold to serve the coffee bar, added dedicated waterline and circuit for coffeewow autoclean system, add glycol chiller and nitrogen generator for nitro coffee · 67 m away
- 3022 Forest LnOct 8, 2020Disconect water and sewer from existing slab · 149 m away
- 2930 Forest LnNov 4, 2020Electrical repairs · 204 m away
- 2945 Allister StJul 7, 2026Underground sewer spot repair hallway bathroom, washing machine and toilet · 212 m away
- 2947 Allister StJan 22, 2026Sewer leak repair on system 1 by 5 ft. outside tunnel on left side of duplexsewer leak repairs on system 2 by 22 ft. interior tunnel on the right side of duplex · 212 m away
- 2949 Allister StApr 7, 2026Gas test two gas valves and a cracked elbow and reset test · 213 m away
- 2952 Allister StJan 11, 2021Electrical repairs · 226 m away
- 2939 Allister StNov 10, 2026Foundation repair · 226 m away
- 2938 Allister StDec 4, 2025Mcr with battery residential addition - solar rooftop, backup battery, and mpu/mpr · 229 m away
- 2935 Allister StNov 4, 2020Replace or modify existing hvac · 237 m away