1941 Record Crossing Road
Dallas, TX 75235 · Ut Southwestern Medical Center
Pedestrian crossing and ADA route work registered at 1941 Record Crossing
A pedestrian crossing and ADA route renovation is planned at 1941 Record Crossing Road, with sidewalk, ramp and flasher improvements, including modular ramps and stairs. The project was registered with TDLR on October 16, 2026; the applicant estimated its cost at $300,000.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 16, 2026
- since Oct 16, 2026
- Largest scope
- 2,500 sf
- Estimated cost
- $300K
- state registration
Where this project stands
Approved · construction starts Dec 1, 2026UTSW CUH GARAGE CROSSING - PEDESTRIAN CROSSING AND ADA ROUTE
2,500 sq ft · $300K est.
- RegisteredOct 16, 2026
- Plan review
- ConstructionDec '26 – Jun '27
- Inspected
- Closed
A 6-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectSidewalk, ramp, and flasher improvements with modular ramps and stairs sq ft= ~2,500 — clements university hospital
TDLR project registrationRenovation/AlterationReview Complete2,500 sq ft$300K est.- Project #
- TABS2027003761
- Tenant / owner
- Utsw Cuh Garage Crossing - Pedestrian Crossing And Ada Route
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1941 Record Crossing Road
What is being built at 1941 Record Crossing Road?
The TDLR registration describes sidewalk, ramp and flasher improvements for a pedestrian crossing and ADA route, including modular ramps and stairs.
When was the 1941 Record Crossing Road project filed?
The project was registered with TDLR on October 16, 2026. Its registration number is TABS2027003761.
How much will the pedestrian crossing work cost?
The applicant estimated the project cost at $300,000 in the TDLR registration. This is an estimate, not a reported final cost.
How large is the 1941 Record Crossing Road project?
The TDLR registration lists an area of about 2,500 square feet.
What is the status of the Record Crossing Road project?
The TDLR registration lists the status as “Review Complete.”
Is the pedestrian crossing project near UTSW CUH Ed Reno?
Yes. The nearby-landmarks data lists UTSW CUH Ed Reno at 6201 Harry Hines Boulevard, about 324 meters away.
Also being built nearby
All of 75235- 1950 Record Crossing Road · Board Of Regents Of The University Of Texas SystemOct 3, 2025Utsw record crossing lot — new construction — (use lf for rows)sq ft= the entire site area is 122,000 sq ft (1.8ac). minimal impact to row · 31 m away
- 1950 Record Crossing RdAug 10, 2026There is a new parking lot that was constructed earlier this year along the 1900 block of record crossing rd between acorn ct and lee hall dr. as part of the construction of the new parking lot, there were two dedicated drive approaches constructed. the drive approaches from the previous properties along this block, 10 in total, were left untouched. the proposed work will remove the old approaches that lead to no where, install curb for a continuous look down record crossing, and install sod with irrigation. this work will only effect the area between the sidewalk and the record crossing roadway on the south side of the street between acorn ct and lee hall dr · 31 m away
- 1839 Chattanooga PlMay 13, 2025Replacing condenser and air handler unit · 122 m away
- 1910 Chattanooga PlJun 12, 2026Water heater change-out · 122 m away
- 1914 Chattanooga PlOct 16, 2026Gas pressure · 124 m away
- 1922 Chattanooga PlMay 19, 2026Install gas lines inside house · 128 m away
- 1836 Prairie View DrMay 27, 2025Replacing 4 ton gas hvac system · 228 m away
- 5773 Arlington Park DrJun 23, 2025We will be removing old roof and installing a new 30 year roof · 236 m away
- 5759 Arlington Park DrSep 24, 2026Install new hvac system with ductwork · 236 m away
- 5751 Arlington Park DrOct 20, 2026Install new hvac system with ductwork · 238 m away
- 1808 Prairie View DrNov 12, 2026New plumbing installation · 240 m away
- 5739 Arlington Park DrOct 29, 2026Install new vac system with ductwork · 243 m away