Meter repairs filed at 2053 Empire Central
Commercial electrical permits at 2053 Empire Central indicate meter repair and a fix to the meter enclosure, not a new building project. The meter repair permit was filed June 22, 2026, and the enclosure-fix permit was filed July 22, 2026.
Summarized from City of Dallas records · updated Jul 22, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 22, 2026
- since Jun 22, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2053 Empire Central
What is happening at 2053 Empire Central?
City of Dallas permits indicate meter repair and a fix to the meter enclosure. They do not describe new construction.
Is a new building being built at 2053 Empire Central?
The two available permits describe electrical work on a meter and its enclosure, not construction of a new building.
When were permits filed for 2053 Empire Central?
The meter repair permit, COM-ELC-26-002801, was filed June 22, 2026. The permit to fix the meter enclosure, COM-ELC-26-003347, was filed July 22, 2026.
What work does permit COM-ELC-26-003347 cover?
The City of Dallas permit filed July 22, 2026, describes work to fix the meter enclosure.
What work does permit COM-ELC-26-002801 cover?
The City of Dallas commercial electrical permit filed June 22, 2026, describes meter repair.
Also being built nearby
All of 75235- 2045 Empire CentralDec 23, 2025Gas test · 21 m away
- 2043 Empire CentralDec 29, 2025Gas test · 26 m away
- 2025 Empire CentralSep 23, 2026Electrical release, no work being done · 74 m away
- 7002 Harry Hines BlvdJun 8, 20267002 harry hines blvd - demolish and haul away all structures safely to the landfill. utilities will be shutoff and capped prior to demolition · 137 m away
- 2030 Shea RdOct 6, 2026Electrical for condominiums · 166 m away
- 6999 Harry Hines BlvdJun 1, 2026Pedestal service for traffic signal at empire central-harry hines. it was damaged by bore machine hitting oncor line side and pulling wire feeding pedestal. we had to replace the line side lugs in back side of pedestal · 167 m away
- 2045 Shea RdOct 7, 20261-8 consolidated housing · 170 m away
- 2033 Shea RdDec 22, 2025Install new hvac system with ductwork · 176 m away
- 2029 Shea RdNov 6, 2025Gas meter relocate · 179 m away
- 2121 Empire CentralDec 11, 2025Relocate gas meter on behalf of atmos · 179 m away
- 2103 Shea RdNov 7, 2025Gas meter relocate · 182 m away
- 2116 Shea RdJan 11, 2021Install any new fire sprinkler system · 185 m away