2815 Hedgerow Dr
Dallas, TX 75235
Permits cover a home renovation at 2815 Hedgerow Dr
City of Dallas permits filed from June 27 to August 29, 2025, indicate renovation work at the single-family home at 2815 Hedgerow Dr. The records cover interior updates, electrical and plumbing work, a new heating and air-conditioning system, and replacement of the driveway approach and sidewalk.
Summarized from City of Dallas records · updated Aug 29, 2025
- Projects
- 7
- 7 filings
- Latest filing
- Aug 29, 2025
- since Jun 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsRemove and replace approach: 21 ft. at bottom at the curb line. 18 ft. at the top of the approach where it meets the sidewalk. anchor approach to road with #5 rebar dowels. approach to be 6in. thick, #4 rebar @ 18in. o/c and 3500 psi. concretecity sidewalk: remove and replace 18ft. x 4ft. city sidewalk in front of the driveway. 4in. thick, #3 rebar @ 18in. o/c and 3500 psi. concrete
Remove and replace approach: 21 ft. at bottom at the curb line. 18 ft. at the top of the approach where it meets the sidewalk. anchor approach to road with #5 rebar dowels. approach to be 6in. thick, #4 rebar @ 18in. o/c and 3500 psi. concretecity sidewalk: remove and replace 18ft. x 4ft. city sidewalk in front of the driveway. 4in. thick, #3 rebar @ 18in. o/c and 3500 psi. concrete
City of Dallas permitResidential Drive Approach and Sidewalk PermitReplace all new sewer line from city to the houseinstall new clean outs repipe all drain pipes under and inside the house repipe all water lines under and inside the house total of 3 full baths and 1 half bath re-run gas line to furnace
Replace all new sewer line from city to the houseinstall new clean outs repipe all drain pipes under and inside the house repipe all water lines under and inside the house total of 3 full baths and 1 half bath re-run gas line to furnace
City of Dallas permitResidential Plumbing PermitNsfaa--- list of action items ---1- new paint inside and outside the house2- new flooring3- new kitchen vabnits4- fix damage dry wall and lumber5- new windows and doors
Nsfaa--- list of action items ---1- new paint inside and outside the house2- new flooring3- new kitchen vabnits4- fix damage dry wall and lumber5- new windows and doors
City of Dallas permitResidential Alteration Addition PermitReplace all new sewer line from city to the houseinstall new clean outsrepipe all drain pipes under and inside the houserepipe all water lines under and inside the housetotal of 3 full baths and 1 half bathre-run gas line to furnace
Replace all new sewer line from city to the houseinstall new clean outsrepipe all drain pipes under and inside the houserepipe all water lines under and inside the housetotal of 3 full baths and 1 half bathre-run gas line to furnace
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 2815 Hedgerow Dr
What is being built at 2815 Hedgerow Dr?
City of Dallas permits indicate renovation work at a home, not a new building. The listed work includes interior updates, electrical and plumbing work, and a new heating and air-conditioning system.
When were permits filed for work at 2815 Hedgerow Dr?
The records span June 27 through August 29, 2025. The latest listed permit, RES-MEC-25-002279, was filed August 29 for a new heating and air-conditioning system with ductwork.
What interior work is planned at 2815 Hedgerow Dr?
A July 14, 2025, alteration permit, RES-ALT-ADD-25-000383, lists interior and exterior paint, new flooring and kitchen cabinets, drywall and lumber repairs, and new windows and doors.
Are electrical upgrades planned at 2815 Hedgerow Dr?
Yes. City records include a whole electrical remodel permit filed June 27, 2025 (RES-ELC-25-000979), and a new rewire and service permit filed July 15 (RES-ELC-25-001418).
What plumbing work is permitted at 2815 Hedgerow Dr?
Permits filed June 30 and July 16, 2025, cover sewer-line replacement, new cleanouts, repiping drain and water lines, and rerunning the gas line to the furnace. The records list three full bathrooms and one half bathroom.
Is the driveway or sidewalk being replaced at 2815 Hedgerow Dr?
A residential driveway approach and sidewalk permit filed August 11, 2025 (RES-DSW-25-000303), covers replacing the driveway approach and an 18-by-4-foot section of sidewalk in front of it.
Also being built nearby
All of 75235- 2802 Hedgerow DrNov 16, 2020Sewer relay · 39 m away
- 2831 Hedgerow DrMar 23, 2026Replacing 4 ton gas complete system · 57 m away
- 2826 Hedgerow DrMar 25, 2026Hvac replacement · 59 m away
- 2837 Hedgerow DrJun 27, 2025We performed a hydrostatic test, another company performed a top out · 64 m away
- 2832 Hedgerow DrFeb 11, 2026Replacing 4 ton heat pump system · 65 m away
- 2841 Hedgerow DrJun 9, 2025Install 14 intellijacks under the home to stabilize the foundation · 69 m away
- 2836 Hedgerow DrSep 8, 2026Demolish approx 1000 sq ft single family home and remove existing foundation · 70 m away
- 2845 Hedgerow DrSep 8, 2026Whole home water repipe · 74 m away
- 2847 Carlson DrAug 13, 2025Electric service repair / upgrade · 106 m away
- 5427 Stoneleigh AveOct 16, 2026Gas leak location · 136 m away
- 2915 Carlson DrJul 22, 2025Private residential ev charger tied into existing msp #6 cu, #8cu gnd, 3/4" emt or equivalent feeder conductors sized per: nec 625.21, 310.16 · 137 m away
- 5422 Denton DrSep 22, 2025Spot repair to the water service line, close to the house · 138 m away
More restaurants in 75235.