6201 Harry Hines Blvd
Dallas, TX 75235 · Utsw Simmons Biomedical Research Building Level 04 Renovations, Utsw Cuh Level 2 Lab Buildout
Simmons Biomedical Research Building renovations and roof work
Renovations to Level 04 of the existing Simmons Biomedical Research Building include converting a storage room into an equipment galley, replacing a cold room with a similar-size room, and updating equipment. The TDLR project registration was filed May 20, 2025; a separate commercial roofing permit to replace the roof system was filed August 27, 2025.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Aug 27, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Aug 27, 2025
- since May 20, 2025
- Largest scope
- 2,100 sf
- Estimated cost
- $3.5M
- state registration
Where this project stands
Inspected · closing outUTSW Simmons Biomedical Research Building Level 04 Renovations
2,100 sq ft · $3.5M est.
- RegisteredMay 20, 2025
- Plan review
- ConstructionMay '25 – Nov '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
3 projectsModify existing storage room into an equipment galley, replace existing cold room with a new room of similar size, replace existing cold room with a new room of similar, refresh space with updated equipment. — simmons biomedical research building
TDLR project registrationRenovation/AlterationInspection Complete2,100 sq ft$3.5M est.- Project #
- TABS2025019388
- Tenant / owner
- Utsw Simmons Biomedical Research Building Level 04 Renovations
- Design firm
- Pro
- Contact
- Pro
2,980 sq ft new laboratory construction in existing shell space with no hazards. — ut southwestern medical center
TDLR project registrationRenovation/AlterationProject Closed2,980 sq ft$1.4M est.- Project #
- TABS2024004046
- Tenant / owner
- Utsw Cuh Level 2 Lab Buildout
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 6201 Harry Hines Blvd
What is being built at 6201 Harry Hines Blvd?
Records describe renovations to Level 04 of the existing Simmons Biomedical Research Building, including an equipment galley, a replacement cold room, and updated equipment. A separate permit covers replacement of the building’s roof system.
When were the renovations at 6201 Harry Hines Blvd filed?
The TDLR registration for the Level 04 renovations was filed May 20, 2025. The project registration, TABS2025019388, lists the work as 2,100 square feet and its status as inspection complete.
Is a new building going up at 6201 Harry Hines Blvd?
The records describe renovations to an existing research building and replacement of its roof system, not a new building.
What does the Level 04 renovation include?
The scope includes converting an existing storage room into an equipment galley, replacing a cold room with a new room of similar size, and refreshing the space with updated equipment.
How much is the Simmons Biomedical Research Building renovation estimated to cost?
The TDLR registration lists an estimated project cost of $3.5 million. This is the applicant’s estimate for the renovation project.
What work is happening near the New Pediatric Campus on Harry Hines?
At 6201 Harry Hines Blvd, records show Level 04 renovations at the Simmons Biomedical Research Building and a separate roof replacement permit. The New Pediatric Campus is listed at 6300 Harry Hines Blvd.
Also being built nearby
All of 75235- 6201 Harry Hines Boulevard · University Of Texas Southwestern Medical CenterOct 6, 2026Utsw cuh ed reno — renovation/alteration — 5000-sq ft renovation of emergency department
- 6201 Harr Hines Blvd · Ut Southwestern Medical CenterMay 27, 2026Utsw endo 6 new c-arm — renovation/alteration — the project scope includes the replacement of a imaging c-arm and procedure table as well as finish renovations of an existing endoscopy procedure room on the second floor of the utsw cuh. eq. required electrical utilities upgrades also included
- 6201 Harry Hines Blvd · Ut Southwestern Medical Center’s William P. Clements Jr. University HospitalOct 21, 2026Utsw cuh organ perfusion suite — renovation/alteration — renovation of existing equipment storage room into an organ perfusion suite. 570 sq ft
- 6201 Harry Hines Boulevard · Ut Southwestern Medical CenterMay 27, 2026Utsw cuh thoracic or renovation — renovation/alteration — renovation on existing support core, located on level 3 of cuh, to add (1) one new operating room, a pump room, (2) storage/ equipment rooms, (2) clean supply, (2) day surgery rooms, (2) pacu rooms, (2) consult rooms and anesthesia workroom
- 6202 Harry Hines Blvd, 7th · University Of Texas SystemAug 31, 2026Utsw nm7 shell — renovation/alteration — this project is the infill of existing shell on level 7 of nm cancer treatment outpatient building. the scope includes 2 procedure rooms, 20 exam rooms, and patient and staff support spaces · 56 m away
- 6202 Harry Hines Blvd · Ut Southwestern Medical CenterDec 2, 2024Utsw - 7695 nm renovation — renovation/alteration — renovation of existing office area, providing new flooring and paint, additional power and data to accommodate updated furniture layout · 56 m away
- 6300 Harry Hines BlvdNov 13, 2026Zone b level b2_plumbing · 118 m away
- 6011 Harry Hines Blvd., Dallas, TX 75235 · Board Of Regents Of University Of Texas SystemFeb 8, 2024Utsw v2 sho-po expansion — renovation/alteration — 2,752 sq ft renovation of prosthetics and orthotics workshop space · 187 m away
- 6011 Harry Hines Blvd · Ut Southwestern Allied Health Sciences SchoolJan 5, 2026Utsw building v ada improvements — renovation/alteration — the project includes the reconstruction of sidewalk to meet ada requirements · 187 m away
- 6400 Harry Hines Blvd · Board Of Regents Of University Of Texas SystemJan 23, 2024Utsw nm02 integrative therapies — renovation/alteration — renovation of the existing shell space on level 2 of the nm building into an integrative therapy space · 207 m away
- 1950 Record Crossing RdAug 10, 2026There is a new parking lot that was constructed earlier this year along the 1900 block of record crossing rd between acorn ct and lee hall dr. as part of the construction of the new parking lot, there were two dedicated drive approaches constructed. the drive approaches from the previous properties along this block, 10 in total, were left untouched. the proposed work will remove the old approaches that lead to no where, install curb for a continuous look down record crossing, and install sod with irrigation. this work will only effect the area between the sidewalk and the record crossing roadway on the south side of the street between acorn ct and lee hall dr · 316 m away
- 1950 Record Crossing Road · Board Of Regents Of The University Of Texas SystemOct 3, 2025Utsw record crossing lot — new construction — (use lf for rows)sq ft= the entire site area is 122,000 sq ft (1.8ac). minimal impact to row · 316 m away