About 80 feet of sewer line to be replaced at 6801 Harry Hines
A commercial plumbing permit filed May 7, 2026, covers replacement of approximately 80 feet of sewer line at 6801 Harry Hines Blvd. The City of Dallas record is permit COM-PLM-26-001722.
Summarized from City of Dallas records · updated May 7, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 7, 2026
- since May 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6801 Harry Hines Blvd
What is happening at 6801 Harry Hines Blvd in Dallas?
A City of Dallas commercial plumbing permit covers replacing approximately 80 feet of sewer line. The permit, COM-PLM-26-001722, was filed May 7, 2026.
Is a new building being built at 6801 Harry Hines Blvd?
The available record is for sewer line replacement, not construction of a new building. It describes replacing approximately 80 feet of sewer line.
What work does permit COM-PLM-26-001722 cover?
The permit covers replacement of approximately 80 feet of sewer line at 6801 Harry Hines Blvd. It was filed with the City of Dallas on May 7, 2026.
When was the sewer work at 6801 Harry Hines permitted?
The City of Dallas permit was filed May 7, 2026. The record identifies the work as a commercial plumbing permit.
How much sewer line is being replaced at 6801 Harry Hines?
The permit description says approximately 80 feet of sewer line will be replaced. It does not provide a project cost or construction schedule.
Also being built nearby
All of 75235- 6814 Harry Hines BlvdOct 20, 2026Installation of approximately 300 linear feet of new 6-foot-tall galvanized chain-link fencing at 6814 harry hines blvd, dallas, tx 75235.fence construction will include 2-3/8-inch, 16-gauge steel posts with welded base plates anchored to existing concrete, along with four core-drilled support posts. fencing will consist of 2-inch, 11-gauge galvanized chain-link fabric, 1-5/8-inch top rail, bottom tension wire, and required fittings.the project also includes installation of one 20-foot-wide double-swing chain-link gate with two 10-foot leaves, three strands of barbed wire, commercial-grade latch, and cane bolts.work will include limited asphalt removal at designated post locations, installation of all necessary hardware, and cleanup of construction debris · 49 m away
- 6909 Harry Hines BlvdNov 3, 2026Vacant space. clean & show for temporary use · 213 m away
- 1853 W Mockingbird LnAug 26, 2026Building 3 is going to take 20 exterior steel reinforced concrete bellbottom piers under perimeter beam. and 5 interior polyurethane piers. to raise and stabilize foundation · 231 m away
- 2111 W Mockingbird LnSep 30, 2026Electrical for construction trailer offices on site. applied for co-26-004923 · 256 m away
- 1840 W Mockingbird LnJan 14, 2021Commercial remodel atc 278051 tmo equipment upgrade to existing c · 266 m away
- 2119 Langston CtOct 21, 2025Replacing existing gas line with new gas line approx 160' 1" high pressure line and hooking up two gas heating unitspressure test and release to atmos thank you! · 280 m away
- 1807 W Mockingbird LnNov 25, 2025Electrical work for site work · 328 m away
- 6999 Harry Hines BlvdJun 1, 2026Pedestal service for traffic signal at empire central-harry hines. it was damaged by bore machine hitting oncor line side and pulling wire feeding pedestal. we had to replace the line side lugs in back side of pedestal · 342 m away
- 2025 Empire CentralSep 23, 2026Electrical release, no work being done · 347 m away
- 7002 Harry Hines BlvdJun 8, 20267002 harry hines blvd - demolish and haul away all structures safely to the landfill. utilities will be shutoff and capped prior to demolition · 349 m away
- 2043 Empire CentralDec 29, 2025Gas test · 360 m away
- 2045 Empire CentralDec 23, 2025Gas test · 361 m away