7125 Harry Hines Blvd
Dallas, TX 75235
Utility permits at 7125 Harry Hines Blvd
City of Dallas records show an electrical permit filed October 15, 2025, for a clean-and-show inspection to restore power, with no electrical work listed. A gas test permit followed on October 20, 2026. These records do not describe new construction.
Summarized from City of Dallas records · updated Oct 20, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Oct 20, 2026
- since Oct 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 7125 Harry Hines Blvd
What is being built at 7125 Harry Hines Blvd?
The available Dallas permits do not describe a new building or construction project. They record an electrical clean-and-show inspection and a gas test.
What are the permits for at 7125 Harry Hines Blvd?
Permit COM-ELC-25-002477, filed October 15, 2025, says “Clean and show, to get the power turned on” and specifies no electrical work. Permit COM-PLM-26-004008, filed October 20, 2026, is for a gas test.
Is a new business opening at 7125 Harry Hines Blvd?
The available permit records do not name a business or say that one is opening. They list electrical and plumbing-related permit activity.
Is there a construction project at 7125 Harry Hines Blvd in Dallas?
The records provided do not describe new construction. They show a clean-and-show electrical inspection with no work listed and a gas test.
When were permits filed for 7125 Harry Hines Blvd?
The electrical permit was filed October 15, 2025, and the gas test permit was filed October 20, 2026.
What does permit COM-ELC-25-002477 cover?
The City of Dallas electrical permit, filed October 15, 2025, describes a clean-and-show inspection to get the power turned on and says no electrical work.
Also being built nearby
All of 75235- 7109 Harry Hines BlvdJun 18, 2025Size carport roof 20x9 on the side of building · 8 m away
- 7218 Harry Hines BlvdMay 8, 2026Natural gas test · 30 m away
- 7200 Harry Hines BlvdAug 4, 2025Clean and show / no work done · 34 m away
- 2029 Shea RdNov 6, 2025Gas meter relocate · 84 m away
- 2033 Shea RdDec 22, 2025Install new hvac system with ductwork · 92 m away
- 2030 Shea RdOct 6, 2026Electrical for condominiums · 92 m away
- 2045 Shea RdOct 7, 20261-8 consolidated housing · 115 m away
- 7316 Harry Hines BlvdFeb 4, 2026New electrical remodel install new electrical service and new lights and plugs new electrical rough · 121 m away
- 7318 Harry Hines BlvdOct 28, 2026Installing new electrical panel and new lights and switchs and outlets · 124 m away
- 7322 Harry Hines BlvdOct 28, 2026Installing new electrical panels and new lights and switches and outlets · 128 m away
- 7324 Harry Hines BlvdOct 14, 2026We are doing new electrical remodel installing new lights and new electrical panels · 130 m away
- 7307 Hines PlJun 22, 2026Power was cut by oncor. need inspection to get reenergized. no new work done. 240 volt service · 155 m away