8411 Lemmon Ave
Dallas, TX 75235
Boiler makeup-water RPZ replacement permitted
A commercial plumbing permit covers replacing the 3/4-inch RPZ that feeds the boiler makeup water at 8411 Lemmon Ave. The City of Dallas permit was filed on August 27, 2026, under permit COM-PLM-26-003270.
Summarized from City of Dallas records · updated Aug 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 27, 2026
- since Aug 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8411 Lemmon Ave
What is being built at 8411 Lemmon Ave?
The permit is for replacing a 3/4-inch RPZ that feeds the boiler makeup water. It describes plumbing replacement work, not a new building.
When was the plumbing permit filed for 8411 Lemmon Ave?
The City of Dallas filed permit COM-PLM-26-003270 on August 27, 2026.
What is an RPZ at 8411 Lemmon Ave?
The permit identifies a 3/4-inch RPZ serving the boiler makeup water and calls for its replacement.
Is new construction planned at 8411 Lemmon Ave?
The available permit describes replacing plumbing equipment; it does not describe new construction.
What work is happening near Hangar B, Office Alteration on Lemmon Ave?
At 8411 Lemmon Ave, the City of Dallas recorded a permit to replace the 3/4-inch RPZ feeding boiler makeup water. The nearby Hangar B, Office Alteration is listed at 8611 Lemmon Ave.
Also being built nearby
All of 75235- 8405 Lemmon AveSep 15, 2025Replacing rpz · 128 m away
- 3625 George Coker CirOct 27, 2025Electrical non work permit only · 172 m away
- 8609 Glencrest LnOct 24, 2020Install swimming pool & spa · 198 m away
- 8615 Glencrest LnMay 30, 2025Hvac changeout · 202 m away
- 8525 Glencrest LnMar 17, 2026Replace tankless wh · 240 m away
- 8536 Glencrest LnAug 27, 2025Replace halo 5- 5 stage filtration water heater · 240 m away
- 8611 Lemmon Ave · Business Jet CenterMay 4, 2026Demolition 2 mini splitsfurnish and install 3 new linear slot diffusers for locker rooms with 2 new exhaust grills · 246 m away
- 8718 Rexford DrApr 29, 2026Replacing (2) 50 gallon electric water heaters in garage closet · 248 m away
- 8518 Glencrest LnJan 28, 2021Install swimming pool · 253 m away
- 8730 Rexford DrSep 3, 2026Gas test · 265 m away
- 8735 Rexford DrSep 4, 2026New build · 266 m away
- 8740 Rexford DrDec 4, 2025Nsfaa we are redesigning the front elevation of the house by enlarging the current front porch, adding dormers to the roofline and putting on a new roof, changing out the front windows and front door, adding new gutters and shutters. we are also demolishing and rebuilding a screened in back porch. relandscaping front yard · 292 m away