3333 Dan Morton Drive
Dallas, TX 75236 · Wwf Operating Company, Dba: Danone
Danone registers 8,483-square-foot facility work in Dallas
A project at 3333 Dan Morton Drive calls for a compressor room and equipment silo tank pad, plus a remodel for a new equipment layout. Danone’s project registration was filed on September 26, 2024. The applicant estimated the project cost at $5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 26, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 26, 2024
- since Sep 26, 2024
- Largest scope
- 8,483 sf
- Estimated cost
- $5.0M
- state registration
Where this project stands
Under constructionDanone DTX Filler
8,483 sq ft · $5.0M est.
- RegisteredSep 26, 2024
- Plan review
- ConstructionOct '24 – Oct '29
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectAddition of a compressor room (725 sq ft), addition of equipment silo tank pad (500 sq ft), and remodel of existing for new equipment layout (7,258 sq ft). — danone n.a
TDLR project registrationAdditions to Existing BuildingReview Complete8,483 sq ft$5.0M est.- Project #
- TABS2025001863
- Tenant / owner
- Danone Dtx Filler
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3333 Dan Morton Drive
What is being built at 3333 Dan Morton Drive?
The Danone DTX Filler project includes a 725-square-foot compressor room, a 500-square-foot equipment silo tank pad, and a remodel of 7,258 square feet for a new equipment layout.
When was the Danone project in Dallas registered?
The Texas Department of Licensing and Regulation registration was filed on September 26, 2024. Its project number is TABS2025001863.
How large is the project at 3333 Dan Morton Drive?
The registration lists 8,483 square feet of work, including additions and a remodel.
How much is the Danone DTX Filler project estimated to cost?
The applicant’s estimated cost for the project is $5 million.
What does the Danone project registration include?
It lists additions to an existing building: a compressor room and equipment silo tank pad, along with a remodel for a new equipment layout. The registration status is Review Complete.
Also being built nearby
All of 75236- 3333 Dan Morton DrMar 11, 2026Install new supply air duct
- 3515 Britt StMar 9, 2026Install new hvac system · 302 m away
- 5450 W Kiest BlvdFeb 4, 2026Replace stolen service wire · 354 m away
- 5706 Margewood DrOct 7, 2026Install 3 ton (electric) a/c system complete with ductwork · 384 m away
- 5701 W Kiest BlvdOct 1, 2026Gas test · 420 m away
- 5701 W Kiest BlvdOct 6, 2026Primary and paint booth wiring · 420 m away
- 5609 Millar DrOct 21, 2025Gas test · 434 m away
- 5610 Millar DrSep 14, 2026Building permit # res-solar-26-000318 - installation of a grid-tied, roof-mounted, solar pv system · 447 m away
- 3636 Dan Morton DrJun 26, 2025Disconnect power and motor feeders to fire pump controller, so sprinkler company can replace controller.after the controller is replaced rewire from meter to pump · 453 m away
- 5800 W Kiest BlvdFeb 10, 2026Demolition of power and lighting to existing office space within warehouse · 459 m away
- 5835 Margewood DrApr 30, 2026Replace 200 amp panel · 517 m away
- 5821 Millar DrFeb 12, 2026This house has been abandoned for over 20 years. i need to demolish it to build a new house · 568 m away