groundranger
Recent · latest filing Mar 2026Commercial

3433 Morse Dr

Dallas, TX 75236

Covered pedestrian bridge to be rebuilt at 3433 Morse Dr

Dallas permit records filed Feb. 24, 2026, describe demolishing and rebuilding an existing covered, enclosed pedestrian bridge connecting the parking lot to the building. A March 17 electrical permit covers new lights and plugs on the rebuilt bridge and relocation of existing electrical conduits.

Summarized from City of Dallas records · updated Mar 17, 2026

Projects
2
2 filings
Latest filing
Mar 17, 2026
since Feb 24, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Addition of new lights and plugs on rebuilt skybridge, relocate existing electrical conduits from existing skybridge to existing conveyer bridge, provide trench to rebuilt skybridge tower

    Addition of new lights and plugs on rebuilt skybridge, relocate existing electrical conduits from existing skybridge to existing conveyer bridge, provide trench to rebuilt skybridge tower

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-001172
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Zo bc project includes demolition and rebuilding of an existing covered/enclosed pedestrian bridge that connects the parking lot and goes into the building. project will include demolition of the main bridge structure down to the concrete piers. bridge will be reconstructed per the drawings to include new covered/enclosed pedestrian bridge

    Zo bc project includes demolition and rebuilding of an existing covered/enclosed pedestrian bridge that connects the parking lot and goes into the building. project will include demolition of the main bridge structure down to the concrete piers. bridge will be reconstructed per the drawings to include new covered/enclosed pedestrian bridge

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001985
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 3433 Morse Dr

What is being built at 3433 Morse Dr?

Permit records describe the demolition and reconstruction of an existing covered, enclosed pedestrian bridge connecting the parking lot to the building. The work also includes electrical updates to the rebuilt bridge.

When was the pedestrian bridge project permitted?

The City of Dallas alteration and addition permit, COM-ALT-ADD-25-001985, was filed Feb. 24, 2026. An electrical permit, COM-ELC-26-001172, followed on March 17, 2026.

Is the existing bridge being demolished?

Yes. The Feb. 24 permit describes demolishing the main bridge structure down to its concrete piers before rebuilding it as a covered, enclosed pedestrian bridge.

What electrical work is planned for the rebuilt bridge?

The March 17 electrical permit describes adding lights and plugs, relocating existing electrical conduits from the existing skybridge to an existing conveyer bridge, and providing a trench to the rebuilt skybridge tower.

Is a new building planned at 3433 Morse Dr?

The records describe work on an existing pedestrian bridge, including its demolition and reconstruction. They do not describe a new building.

What is being built near the SL 12, County Creek Drive, Saner Avenue and Zang Boulevard intersections?

Permit records at 3433 Morse Dr describe rebuilding a covered, enclosed pedestrian bridge between the parking lot and the building. The listed intersections are about 492 meters away.

Also being built nearby

All of 75236

More demolitions in 75236, parking structures in 75236.

Get alerts for 3433 Morse Dr