4000 Dan Morton Dr
Dallas, TX 75236 · Frgx-TX-1 LP
Office and warehouse space being readied at 4000 Dan Morton Dr
An existing office and warehouse space at 4000 Dan Morton Dr is being made ready for a future tenant, with improvements to the office, break room, restrooms, warehouse and docks. The TDLR project registration was filed July 22, 2025, followed by City of Dallas alteration permits on August 25 and September 25, 2025.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Aug 12, 2026
- Projects
- 13
- 13 filings
- Latest filing
- Aug 12, 2026
- since Sep 22, 2020
- Largest scope
- 78,333 sf
- Estimated cost
- $700K
- state registration
Permit & project history
13 projects1. make safe 2. relocate 4-existing split stat 3. relocate 1-existing rtu stat 4. install supply and return round pipe and flex per scope 5. install 38-supply grills per scope 6. install 13 greenheck perforated return panels 7. install supply main square duct for 4-existing splits and 1-rtu per scope 8. install 2-greenheck exhaust fan per scope 9. install 3-modine gas heaters and vent out per scope 10. install 3-heat stat 11. 1-lift rental 12. one-year limited labor warranty on this scope of work
1. make safe 2. relocate 4-existing split stat 3. relocate 1-existing rtu stat 4. install supply and return round pipe and flex per scope 5. install 38-supply grills per scope 6. install 13 greenheck perforated return panels 7. install supply main square duct for 4-existing splits and 1-rtu per scope 8. install 2-greenheck exhaust fan per scope 9. install 3-modine gas heaters and vent out per scope 10. install 3-heat stat 11. 1-lift rental 12. one-year limited labor warranty on this scope of work
City of Dallas permitCommercial Mechanical Permit"make-ready" of existing office and warehouse space for future tenant. improvements to office, break room, restrooms, warehouse & docks. — 4000 dan morton dr
TDLR project registrationRenovation/AlterationInspection Complete78,333 sq ft$700K est.- Project #
- TABS2025024087
- Tenant / owner
- 4000 Dan Morton Suite 100
- Design firm
- Pro
- Contact
- Pro
Commercial remodel: modifications within the existing building. new metal building construction not
Commercial remodel: modifications within the existing building. new metal building construction not
City of Dallas permitBuilding (BU) Commercial Renovation$235K
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 4000 Dan Morton Dr
What is being built at 4000 Dan Morton Dr, Dallas?
The records describe renovations to existing office and warehouse space, not a new building. The work is a make-ready for a future tenant and includes improvements to the office, break room, restrooms, warehouse and docks.
What is the project at 4000 Dan Morton Dr for?
The TDLR registration describes a make-ready of existing office and warehouse space for a future tenant. The records do not identify that tenant.
How large is the project at 4000 Dan Morton Dr?
The TDLR registration lists 78,333 square feet for the renovation, filed July 22, 2025.
How much will the 4000 Dan Morton Dr renovation cost?
The TDLR registration lists an applicant-estimated project cost of $700,000. This is an estimate, not a reported final cost.
When were permits filed for 4000 Dan Morton Dr?
The TDLR registration is dated July 22, 2025. Dallas alteration permits followed on August 25, 2025 (COM-ALT-ADD-25-000642) and September 25, 2025 (COM-ALT-ADD-25-000798).
What work is included in the 4000 Dan Morton Dr suite finish-out?
Records describe office, break room, restroom, warehouse and dock improvements. Permits also list electrical work, mechanical work, plumbing fixtures and a finish-out of Suite 100.
Has a tenant been announced for 4000 Dan Morton Dr?
The TDLR description says the space is being made ready for a future tenant, but the records do not name one.
Also being built nearby
All of 75236- 5280 Investment DrApr 28, 2026Replacing a 3/4" backflow in the boiler room · 102 m away
- 5225 Investment DrMay 1, 2026Repair damage caused by wire vandalism · 187 m away
- 5252 Investment DrMar 15, 2026Replace failing backflow 4" febco 805 serial number 0719 with new:sn 4627f - 4" wilkins 350 astdar and bypass sn vga0947 - 3/4" wilkins 950xld · 257 m away
- 3700 Eagle Place DrOct 19, 2026Install new conduit & wiring to power all equipment stations in suite · 353 m away
- 5535 W. Ledbetter St · Cao Dai Tay Ninh Temples Of TexasNov 18, 2024Cao dai tay ninh temples of texas — new construction — construction of new fellowship hall and temple · 450 m away
- 5701 Crystal Lake BlvdJul 17, 2025Set and pour 4" sidewalks · 465 m away
- 5623 W Ledbetter DrSep 18, 2025Electrical inspection · 474 m away
- 5512 W Ledbetter DrNov 13, 2026Site grading, drilled piers, building foundation including concrete, steel building erection, interior finish out (all), concrete paving including subgrade stabilization, pavement markings, landscaping, and related miscellaneous to complete the project · 480 m away
- 3636 Dan Morton DrJun 26, 2025Disconnect power and motor feeders to fire pump controller, so sprinkler company can replace controller.after the controller is replaced rewire from meter to pump · 521 m away
- 5230 W Ledbetter DrOct 29, 2020Upgrade existing electrical service · 581 m away
- 5201 W Ledbetter DrNov 2, 2026Mcr install stone and mortar retaining walls · 586 m away
- 5226 W Ledbetter DrApr 1, 2026Install a 2.5 ton ac on a mobile home · 586 m away