2429 W Wheatland Rd
Dallas, TX 75237
Chick-fil-A drive-thru window change at 2429 W Wheatland Rd
Permits indicate the existing Chick-fil-A at 2429 W Wheatland Rd will replace its drive-thru window with a full-height sliding door. The project was registered with TDLR on September 8, 2026, and a Dallas alteration permit was filed October 21, 2026; the plans call for minor structural, mechanical and electrical work, with no changes to the site or parking count.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 16, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Nov 16, 2026
- since Nov 16, 2026
- Largest scope
- —
- Estimated cost
- $100K
- state registration
Where this project stands
Approved · construction starts Nov 23, 2026Chick-fil-A #02094 - Hampton & I-20
4,792 sq ft · $100K est.
- RegisteredSep 8, 2026
- Plan review
- ConstructionNov '26 – Dec '26
- Inspected
- Closed
A 1-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
7 projectsModification of an existing chick-fil-a restaurant to remove the existing drive-thru window and replace it with a full height sliding door. minor structural, mechanical, and electrical modifications required for drive-thru area. no kitchen equipment or plumbing will be moved or modified. there will be no changes to the site or parking count
Modification of an existing chick-fil-a restaurant to remove the existing drive-thru window and replace it with a full height sliding door. minor structural, mechanical, and electrical modifications required for drive-thru area. no kitchen equipment or plumbing will be moved or modified. there will be no changes to the site or parking count
City of Dallas permitCommercial Alteration Addition PermitReplace (2) rtu at the chickfila location that are same brand same specs as existing units. chickfila purchased equipment through national accounts we are hired to do the changeout
Replace (2) rtu at the chickfila location that are same brand same specs as existing units. chickfila purchased equipment through national accounts we are hired to do the changeout
City of Dallas permitCommercial Mechanical PermitUpdating drive-thru window to sliding door on existing chick-fil-a restaurant — chick-fil-a
TDLR project registrationRenovation/AlterationReview Complete4,792 sq ft$100K est.- Project #
- TABS2027000484
- Tenant / owner
- Chick-Fil-A #02094 - Hampton & I-20
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 2429 W Wheatland Rd
What is being built at 2429 W Wheatland Rd in Dallas?
The permits describe alterations to the existing Chick-fil-A, including replacing its drive-thru window with a full-height sliding door. The Dallas alteration permit is COM-ALT-ADD-26-002264, filed October 21, 2026.
Is a new Chick-fil-A opening at 2429 W Wheatland Rd?
The records describe work at an existing Chick-fil-A restaurant, not a new restaurant opening. The TDLR project registration was filed September 8, 2026.
What changes are planned for the Chick-fil-A drive-thru on W Wheatland Road?
The existing drive-thru window will be removed and replaced with a full-height sliding door. The permit description also calls for minor structural, mechanical and electrical modifications.
Will construction change the parking at 2429 W Wheatland Rd?
The Dallas alteration permit says there will be no changes to the site or parking count. It also says no kitchen equipment or plumbing will be moved or modified.
How much is the Chick-fil-A project at 2429 W Wheatland Rd estimated to cost?
The TDLR registration lists an estimated project cost of $100,000. This is the applicant's estimate for the project.
When were permits filed for work at 2429 W Wheatland Rd?
TDLR registered the renovation on September 8, 2026, under project number TABS2027000484. Dallas filed the alteration permit on October 21, 2026, followed by mechanical and electrical permits in October and November.
Also being built nearby
All of 75237- 2403 W Wheatland RdOct 16, 2025Install 9 total - 2'-0" x 10'-3" covered canopy with 4' fixture (with arms) · 37 m away
- 2499 W Wheatland RdMar 19, 2026Install 1-100amp 120/240 service for traffic signals · 99 m away
- 8520 S Hampton RdApr 6, 2026Electrical for fire pump controller replacement. we will be shutting power off to building for fire pump controller replacement on friday evening around 9:45- 10:30pm and will need power back on around 3:30- 4:00am saturday morning for normal operation saturday morning.billy riley 817-913-1740 · 150 m away
- 2525 W Wheatland RdFeb 2, 2026Suite 234 · 164 m away
- 2301 Parakeet LnSep 16, 2025Electrical new service · 231 m away
- 8414 S Hampton RdOct 28, 2026Bu zo closing off 3 side entrances and changing the hardware on a 4th side entrance · 230 m away
- 8000 S Hampton RdSep 30, 2025Install new service · 241 m away
- 2530 Bishop Allen LnApr 23, 2026Reroof property. remove existing shingles and underlayment. install new underlayment, ice and water, and new shingles along with drip edge and accessories · 411 m away
- 2543 Bishop Allen LnMay 5, 2026Replace 1- 3 ton electric hvac system · 435 m away
- 7942 Jubilant DrNov 17, 2020Install roof mounted solar panels · 435 m away
- 7900 S Hampton RdJul 10, 2026Reshingle roof · 438 m away
- 7935 Christian CtSep 16, 2020Roof mounted grid-interactive solar pv system · 521 m away