3500 W Wheatland Rd
Dallas, TX 75237 · Methodist Hospitals Of Dallas
8,000-square-foot women’s services renovation at Methodist Charlton
Permits indicate an approximately 8,000-square-foot renovation for a relocated women’s services department at Methodist Charlton Medical Center, filed May 28, 2026. Other 2026 permits cover MRI and CT/SPECT equipment work, medical gas piping, and mechanical and electrical upgrades.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 28, 2026
- Projects
- 21
- 21 filings
- Latest filing
- Oct 28, 2026
- since Jun 24, 2025
- Largest scope
- 3,862 sf
- Estimated cost
- $700K
- state registration
Permit & project history
21 projectsProvide necessary labor and material to demolition existing medical gas piping, wall outlets and one (1) zone valve box as shown. * furnish and install one (1) 3/4" reduced pressure back flow preventer and route drain to existing floor sink within penthouse 5001. * furnish and install medical gas piping and wall outlets as shown. * one (1) medical gas certification
Provide necessary labor and material to demolition existing medical gas piping, wall outlets and one (1) zone valve box as shown. * furnish and install one (1) 3/4" reduced pressure back flow preventer and route drain to existing floor sink within penthouse 5001. * furnish and install medical gas piping and wall outlets as shown. * one (1) medical gas certification
City of Dallas permitCommercial Plumbing PermitPgrade and replace components of the mri equipment in mri #1 on the second floor at methodist charlton medical center. removal and replacement will require demolition and reconstruction of the rf shielding enclosure
Pgrade and replace components of the mri equipment in mri #1 on the second floor at methodist charlton medical center. removal and replacement will require demolition and reconstruction of the rf shielding enclosure
City of Dallas permitCommercial Electrical PermitProvide necessary labor and material to demolition previous equipment's roof mounted remote chiller, chilled water heat exchanger, chilled water pump and chemical feed tank to include associated piping back to mains.* provide necessary labor and material to demolition existing air devices and ductwork as shown.* provide necessary labor and material to demolition existing drain line routed through underfloor sleeve serving previous equipment; existing sleeve to be abandoned in place.* provision and installation of (1) roof mounted exhaust fan lef-1 to include roof curb and associated accessories / hoisting
Provide necessary labor and material to demolition previous equipment's roof mounted remote chiller, chilled water heat exchanger, chilled water pump and chemical feed tank to include associated piping back to mains.* provide necessary labor and material to demolition existing air devices and ductwork as shown.* provide necessary labor and material to demolition existing drain line routed through underfloor sleeve serving previous equipment; existing sleeve to be abandoned in place.* provision and installation of (1) roof mounted exhaust fan lef-1 to include roof curb and associated accessories / hoisting
City of Dallas permitCommercial Mechanical PermitThe project scope consists of decommissioning a nuclear medicine room and replacing the ct unit in a ct scan room with a spect unit
The project scope consists of decommissioning a nuclear medicine room and replacing the ct unit in a ct scan room with a spect unit
City of Dallas permitCommercial Alteration Addition PermitUpgrade and replace components of the mri equipment in mri #1 on the second floor at methodist charlton medical center. removal and replacement will require demolition and reconstruction of the rf shielding enclosure
Upgrade and replace components of the mri equipment in mri #1 on the second floor at methodist charlton medical center. removal and replacement will require demolition and reconstruction of the rf shielding enclosure
City of Dallas permitCommercial Alteration Addition PermitReason : bus duct arched and the room is flooded where it's located it's still hot , need oncor to pull fuses. they can't pull fuses without us having permit
Reason : bus duct arched and the room is flooded where it's located it's still hot , need oncor to pull fuses. they can't pull fuses without us having permit
City of Dallas permitCommercial Electrical PermitControls-scope is included (enviromatic-systems) in the mechanical-coverage to meet the intent of the construction-documents.sheetmetal-ductwork demolition & modifications, vav relocations, and diffuser-installations are included. includes insulation where required.all exhaust-fan demolition & new installations on roof are includedelectric unit heater, air-devices, split-system per equipment-schedule m8.010 are included in the mechanical scope-coverage
Controls-scope is included (enviromatic-systems) in the mechanical-coverage to meet the intent of the construction-documents.sheetmetal-ductwork demolition & modifications, vav relocations, and diffuser-installations are included. includes insulation where required.all exhaust-fan demolition & new installations on roof are includedelectric unit heater, air-devices, split-system per equipment-schedule m8.010 are included in the mechanical scope-coverage
City of Dallas permitCommercial Mechanical PermitRenovation of approximately 8,000 sq ft at the second level of the methodist charlton medical center for a relocated women's services department
Renovation of approximately 8,000 sq ft at the second level of the methodist charlton medical center for a relocated women's services department
City of Dallas permitCommercial Alteration Addition Permit1) perform piping demolition both underfloor & overhead per swv, hot/cold-water, & med-gas (med gas submitted in previous application per city request)2) perform piping installations for both underfloor & overhead per swv, hot/cold-water, piping insulation, & med-gas with accessory-equipment3) all med-gas piping will be installed & tested for leak-integrity, provided med-gas 3rd-party recertification, and inspected by the authority having jurisdiction for the city of dallas, tx.4) provide and install all listed fixtures & quantities for the project
1) perform piping demolition both underfloor & overhead per swv, hot/cold-water, & med-gas (med gas submitted in previous application per city request)2) perform piping installations for both underfloor & overhead per swv, hot/cold-water, piping insulation, & med-gas with accessory-equipment3) all med-gas piping will be installed & tested for leak-integrity, provided med-gas 3rd-party recertification, and inspected by the authority having jurisdiction for the city of dallas, tx.4) provide and install all listed fixtures & quantities for the project
City of Dallas permitCommercial Plumbing PermitPerform piping demolition both underfloor & overhead per swv, hot/cold-water, & med-gasperform piping installations for both underfloor & overhead per swv, hot/cold-water, piping insulation, & med-gas with accessory-equipmentall med-gas piping will be installed & tested for leak-integrity, provided med-gas 3rd-party recertification, and inspected by the authority having jurisdiction for the city of dallas, tx
Perform piping demolition both underfloor & overhead per swv, hot/cold-water, & med-gasperform piping installations for both underfloor & overhead per swv, hot/cold-water, piping insulation, & med-gas with accessory-equipmentall med-gas piping will be installed & tested for leak-integrity, provided med-gas 3rd-party recertification, and inspected by the authority having jurisdiction for the city of dallas, tx
City of Dallas permitCommercial Plumbing PermitPlumbing work consists of reinstalling an existing hand sink and reconnecting it to existing domestic water and sanitary rough-ins, installing a new cold-water branch line and tying it into an existing water line, and providing a new isolation valve with capped connection for future use. scope also includes modifying the existing water supply to a beverage dispenser and coffee maker by installing a pressure-reducing valve, backflow prevention device, and filtration assembly as required by code and manufacturer requirements. all work shall be performed per the permitted drawings, applicable plumbing codes, and ahj requirements, and coordinated with architectural, mechanical, electrical, and foodservice equipment trades
Plumbing work consists of reinstalling an existing hand sink and reconnecting it to existing domestic water and sanitary rough-ins, installing a new cold-water branch line and tying it into an existing water line, and providing a new isolation valve with capped connection for future use. scope also includes modifying the existing water supply to a beverage dispenser and coffee maker by installing a pressure-reducing valve, backflow prevention device, and filtration assembly as required by code and manufacturer requirements. all work shall be performed per the permitted drawings, applicable plumbing codes, and ahj requirements, and coordinated with architectural, mechanical, electrical, and foodservice equipment trades
City of Dallas permitCommercial Plumbing PermitElectrical work consists of providing all power distribution, branch circuits, devices, and final connections required for new and relocated servery and foodservice equipment per the permitted drawings and manufacturer requirements. scope includes new and modified circuits from existing and kitchen sub-panels, gfci protection where required, dedicated connections for ovens, hot/cold wells, refrigerated cases, heat lamps, and sneeze guards, and coordination of voltage, phase, amperage, and receptacle types prior to rough-in
Electrical work consists of providing all power distribution, branch circuits, devices, and final connections required for new and relocated servery and foodservice equipment per the permitted drawings and manufacturer requirements. scope includes new and modified circuits from existing and kitchen sub-panels, gfci protection where required, dedicated connections for ovens, hot/cold wells, refrigerated cases, heat lamps, and sneeze guards, and coordination of voltage, phase, amperage, and receptacle types prior to rough-in
City of Dallas permitCommercial Electrical PermitLectrical:-existing 120v circuit, gfci protected 20amplights: 6x maxim flush mount ceiling led light, lumens1450, 20w/120v,max 0.16amps, (wet rated) model:57664wtbkceiling fans: 2x minka air, h20 65", max watts 32/120v,max amps 0.266,-wiring per nec-120v power outlet x2,1x switch for ceiling lights, 1x switch for ceiling fan
Lectrical:-existing 120v circuit, gfci protected 20amplights: 6x maxim flush mount ceiling led light, lumens1450, 20w/120v,max 0.16amps, (wet rated) model:57664wtbkceiling fans: 2x minka air, h20 65", max watts 32/120v,max amps 0.266,-wiring per nec-120v power outlet x2,1x switch for ceiling lights, 1x switch for ceiling fan
City of Dallas permitCommercial Electrical PermitChange out 50 vav boxes as well as changing all duct work and one ahu in the mezzanine and floor 1
Change out 50 vav boxes as well as changing all duct work and one ahu in the mezzanine and floor 1
City of Dallas permitCommercial Mechanical PermitScope of work includes renovation of an existing dining & foodservice servery area. project include replacement of kitchen equipment and millwork, new floor finishes, lighting & furniture. no existing firewalls or barriers will be affected by the renovation
Scope of work includes renovation of an existing dining & foodservice servery area. project include replacement of kitchen equipment and millwork, new floor finishes, lighting & furniture. no existing firewalls or barriers will be affected by the renovation
City of Dallas permitCommercial Alteration Addition PermitRenovation of existing dining & foodservice servery areas. — main building
TDLR project registrationRenovation/AlterationProject Closed3,862 sq ft$700K est.- Project #
- TABS2025026638
- Tenant / owner
- Methodist Health System-Charlton Servery/Dining Renovation
- Design firm
- Pro
- Contact
- Pro
The scope of this work order includes, but is not limited to, all work and items set out in the contract specifications under the following sections and/ordivisions and applicable portions of contract addenda and contract drawings.division 01 - general requirements, pertinent portions thereof applicable to the work of this subcontractdivision 02 - existing conditionsdivision 07 - thermal and moisture protection, pertinent portions thereof applicable to the work of this subcontractdivision 08 - openings, pertinent portions thereof applicable to the work of this subcontractdivision 26 - electricaldivision 28 - electronic safety and securi
The scope of this work order includes, but is not limited to, all work and items set out in the contract specifications under the following sections and/ordivisions and applicable portions of contract addenda and contract drawings.division 01 - general requirements, pertinent portions thereof applicable to the work of this subcontractdivision 02 - existing conditionsdivision 07 - thermal and moisture protection, pertinent portions thereof applicable to the work of this subcontractdivision 08 - openings, pertinent portions thereof applicable to the work of this subcontractdivision 26 - electricaldivision 28 - electronic safety and securi
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 3500 W Wheatland Rd
What is being built at 3500 W Wheatland Rd?
A City of Dallas permit filed May 28, 2026, describes an approximately 8,000-square-foot renovation at Methodist Charlton Medical Center for a relocated women’s services department. Other permits cover equipment and building-system upgrades.
Is Methodist Charlton Medical Center being renovated?
Permits filed in 2026 indicate renovation work, including the women’s services department relocation and updates to medical gas piping and mechanical systems.
How large is the women’s services renovation at 3500 W Wheatland Rd?
The May 28, 2026, alteration permit describes a renovation of approximately 8,000 square feet on the medical center’s second level.
Are MRI or CT equipment upgrades planned at Methodist Charlton?
Yes. 2026 permits describe replacing components of MRI equipment and replacing a CT unit with a SPECT unit. The MRI work includes reconstructing the room’s RF shielding enclosure.
When were permits filed for work at 3500 W Wheatland Rd?
The records span June 24, 2025, through October 28, 2026. Recent filings include permits for medical gas piping on October 28 and MRI equipment work on October 23, 2026.
Are the permits for a new building at Methodist Charlton Medical Center?
The listed permits describe renovations, equipment replacement, demolition, and building-system work. They do not describe construction of a new building.
Also being built nearby
All of 75237- 3500 W Wheatland RdDec 11, 2020Install access control to 5 dorrs locations on the 3rd floor of the l & d department
- 3500 W Wheatland Road · Methodist Health SystemMay 28, 2026Mcmc spect — renovation/alteration — the project scope consists of decommissioning a nuclear medicine room and replacing the ct unit in a ct scan room with a spect unit
- 3450 W Wheatland Rd · Pavilion PropertiesJun 29, 2026Combine unite 220 and 245 into one unit number 245 · 56 m away
- 3430 W Wheatland RdSep 15, 2020Electrical repairs · 74 m away
- 3430 W Wheatland Rd · Pavilion PropertiesAug 24, 2026Install 1 exhaust fanthermostatsductwork · 74 m away
- 3430 W. Wheatland Rd · Pavilion PropertiesJun 4, 2026Methodist woman's health specialists - charlton — renovation/alteration — alterations to two existing suites in an existing office building. one suite is second generation and one suite is shell. both suites will be renovated and combined to form one built out suite · 74 m away
- 3535 W Wheatland RdApr 30, 2026Replacement of backflow valve · 168 m away
- 3650 W Wheatland RdDec 12, 2025Swap restroom fixtures and gas service pressure test for gas release · 267 m away
- 3650 W Wheatland Rd · 3650 W. WheatlandDec 3, 2025Gas repair and test your application is in denial status until we receive the necessary documents to resume review. this action does not deny your overall application; it only denies your current review until the required documents are provided. please upload the missing documents through the record info -> attachments tab so we may complete your request need certificate of occupancy · 267 m away
- 8004 West Virginia DrNov 6, 2026Demolition and install hvac complete systems and associated r8 flex duct for two units · 283 m away
- 8004 W Virginia Drive · West Virginia ApartmentsJun 14, 2024West virginia apartments — renovation/alteration — the proposed scope of work is comprised of a level 1 alteration as defined by the iebc in the existing dwelling units, and at the leasing office, accessible upgrades will be made · 283 m away
- 8017 West Virginia DrSep 24, 2026Install 3 7.5 ton split systems · 314 m away
More demolitions in 75237, warehouses & industrial in 75237, medical facilities in 75237.