A commercial addition and alteration at 3753 W Camp Wisdom Rd is described in a Dallas permit as completed work. The retroactive alteration permit was filed September 16, 2026; a separate electrical permit filed August 27, 2026, was for electrical service with no work.
Summarized from City of Dallas records · updated Sep 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 16, 2026
- since Aug 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsRetro- active permit for commercial addition alteration permit. work has been completed
Retro- active permit for commercial addition alteration permit. work has been completed
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 3753 W Camp Wisdom Rd
What is being built at 3753 W Camp Wisdom Rd?
Dallas permit COM-ALT-ADD-26-002271 describes a commercial addition and alteration, with work completed. The record does not name a tenant or describe the specific work.
When was the commercial alteration at 3753 W Camp Wisdom Rd permitted?
The retroactive commercial addition and alteration permit was filed September 16, 2026. It describes the work as completed.
Was electrical work permitted at 3753 W Camp Wisdom Rd?
A commercial electrical permit, COM-ELC-26-004211, was filed August 27, 2026, for electrical service. Its description says no work.
Is a new business opening at 3753 W Camp Wisdom Rd?
The available Dallas permits do not identify a business or say that one is opening. They document a completed commercial addition and alteration and a separate electrical-service permit.
What's happening near Redbird North Wing at 3753 W Camp Wisdom Rd?
A Dallas permit for a commercial addition and alteration at 3753 W Camp Wisdom Rd describes the work as completed. Redbird North Wing is listed about 310 meters away; the records do not indicate a connection between the sites.
Also being built nearby
All of 75237- 3729 W Camp Wisdom RdJun 5, 2026Mcr non load bearing walls/ partitions in multiple open spaces · 27 m away
- 3709 W Camp Wisdom RdJul 24, 2026Clean and show no work for a meter release · 50 m away
- 3703 W Camp Wisdom RdNov 5, 2020Replace or modify existing hvac · 57 m away
- 3906 W Camp Wisdom RdSep 29, 202620' tunnel kitchen line(the entire building of 3906 w camp wisdom rd) · 88 m away
- 3720 W Camp Wisdom RdDec 2, 2020Gas test · 158 m away
- 3704 W Camp Wisdom RdJun 1, 2026Mechanical, final inspection for mechanical · 172 m away
- 3662 West Camp Wisdom Road · The Shops At RedbirdAug 8, 2024Crossroads community services — renovation/alteration — 5,976 sq ft of interior build out for a food pantry in an existing mercantile building · 208 m away
- 3662 W Camp Wisdom Rd · Avena Salon Suites Of Redbird, LLCDec 14, 2025Walk existing switchgear and see if it is useable · 208 m away
- 7202 S Westmoreland Rd · Tom Thumb RedbirdJul 26, 2024Tom thumb redbird — new construction — new construction for shell and interiors for a tom thumb store · 221 m away
- 3663 W Camp Wisdom RdJul 22, 2026Work : change 1600 a trans socket, replace wire going up risers, terminate 4 sets of 600 mcm on line and load side · 243 m away
- 7220 S Westmoreland RdJun 10, 2025I am submitting this application, due to signing the lease 5/28/2025. after applying for the co under record c-25-000594, was informed the plan i submitted is different than original plan you have on file. even though my organizatoin did not make any changes, i was informed we had to submit for a commercial alteration. the property owner stated there were no additional changes made from the orginal submission · 251 m away
- 7227 S Westmoreland RdMay 28, 2025This site, previously a vacant lot contributing to community safety and quality of life concerns, is undergoing a transformative change led by cpal. with support from the d3 council office, the property owner, the community, and several community-based organizations, cpal has been working to turn this space into a vibrant resource hub for residents.to date, improvements to the lot include:removal of 3 to 4 tons of debris and blightalleviated the property's homeless concernsimplemented processes to maintain premise while site is active.installation of basketball and soccer goalsplacement of two storage containers designed for classroom-style youth programming and direct services.plans to add pallet-style seating and an awning for shade (for yoga, book classes, step classes, and other general outdoor activities) for the communitythe vision for this site is to serve as a hub where community-based organizations can provide free resources—including, but not limited to food, mentoring, and social services—throughout the week for at least the next 12 months · 284 m away