Permits indicate interior enclosure improvements at Gem Lifecycle’s Dallas processing facility at 3950 Platinum Way. A commercial alteration permit filed October 16, 2026, describes new walls, doors and a motorized roll-up door for a secure processing enclosure. Other filings cover pallet-rack installation, roof replacement and gas-line and water-heater repairs.
Summarized from City of Dallas records · updated Nov 5, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Nov 5, 2026
- since Aug 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsRepair 2 " gas line over head hit by forklift & replacing 40 gallon natural gas in fire rising room 100 natural gas water heater above restroom in warehouse
Repair 2 " gas line over head hit by forklift & replacing 40 gallon natural gas in fire rising room 100 natural gas water heater above restroom in warehouse
City of Dallas permitCommercial Plumbing PermitBu zo bishop builders will construct interior enclosure improvements at gem lifecycle's dallas processing facility per updated marked plan notes and onsite discussions. this buildout will create a secure, code-compliant processing enclosure that supports gem's chain-of-custody protocols, material flow efficiency and the integrity of their certified data destruction and recycling operations.scope includes:6" metal stud wall framing — approx. 194 lf total (137 lf × 28' aff full-height + 57 lf × 14' high mezzanine/return sections)5/8" type-x drywall on both sides of all framed walls, taped, bedded, and finished through primer — approx. 9,268 sfsteel moment frame opening engineered for one (1) 14' × 14' industrial motorized roll-up doorstructural engineering allowance for moment frame design and coordinationone (1) 14' × 14' industrial-grade motorized roll-up door with operator packagetwo (2) 36" hollow metal frame doors with commercial lever hardwareone (1) 36" fire/man door with frame and hardware40 lf × 14' high vinyl/pvc soft wall curtain system — approx. 560 sfall anchors, fasteners, slab attachments, debris removal and one-month scissor lift (2) rental general conditions, project management, field supervision and trade coordination
Bu zo bishop builders will construct interior enclosure improvements at gem lifecycle's dallas processing facility per updated marked plan notes and onsite discussions. this buildout will create a secure, code-compliant processing enclosure that supports gem's chain-of-custody protocols, material flow efficiency and the integrity of their certified data destruction and recycling operations.scope includes:6" metal stud wall framing — approx. 194 lf total (137 lf × 28' aff full-height + 57 lf × 14' high mezzanine/return sections)5/8" type-x drywall on both sides of all framed walls, taped, bedded, and finished through primer — approx. 9,268 sfsteel moment frame opening engineered for one (1) 14' × 14' industrial motorized roll-up doorstructural engineering allowance for moment frame design and coordinationone (1) 14' × 14' industrial-grade motorized roll-up door with operator packagetwo (2) 36" hollow metal frame doors with commercial lever hardwareone (1) 36" fire/man door with frame and hardware40 lf × 14' high vinyl/pvc soft wall curtain system — approx. 560 sfall anchors, fasteners, slab attachments, debris removal and one-month scissor lift (2) rental general conditions, project management, field supervision and trade coordination
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 3950 Platinum Way
What is being built at 3950 Platinum Way in Dallas?
A commercial alteration permit describes an interior enclosure at Gem Lifecycle’s Dallas processing facility, including framed walls, doors and a motorized roll-up door. The permit, COM-ALT-ADD-26-002203, was filed October 16, 2026.
Is a new warehouse being built at 3950 Platinum Way?
The permits listed for this address describe work inside an existing warehouse, including an enclosure, pallet racks, roof replacement and repairs. They do not describe construction of a new warehouse.
What is the interior enclosure for at 3950 Platinum Way?
The permit description says the enclosure is intended to support Gem Lifecycle’s chain-of-custody protocols, material flow and certified data destruction and recycling operations.
When was work at 3950 Platinum Way permitted?
The earliest filing in the records is a roofing permit dated August 27, 2025. The latest is a plumbing permit filed November 5, 2026, for gas-line and water-heater work.
What work was permitted at 3950 Platinum Way in November 2025?
A commercial alteration permit filed November 12, 2025, describes installation of pallet racks. Its permit number is COM-ALT-ADD-25-001578.
What is being built near 3939 Platinum Way Storage?
At 3950 Platinum Way, permits describe interior improvements at a processing facility, including a secure enclosure. The enclosure permit was filed October 16, 2026.
Also being built nearby
All of 75237- 3939 Platinum Way · P5 Investments, LLCSep 17, 2026Electrical new construction · 22 m away
- 5220 S Westmoreland RdOct 30, 2026Atmos put a lock on the gas meter we did the gas test, and we found a leak on one of the fittings, and we fixed it and ready to go · 107 m away
- 5100 S. Westmoreland Road · Avra Enterprise, LLCMay 29, 2026Avra auto sales — new construction — office warehouse for auto sales · 146 m away
- 5100 S Westmoreland RdDec 16, 2025Qteam meeting 2.12.2026 (9am) construction of a new commercial building · 146 m away
- 4030 Mint WaySep 15, 2025Widening approach at entrance of parking lot · 331 m away
- 4034 Mint WayMar 24, 2026Tunnel job/sewer line repair · 334 m away
- 4033 Mint WayAug 28, 2026Gas test · 344 m away
- 4809 S Westmoreland RdMar 31, 2026Install a 50-gallon natural gas water heater · 354 m away
- 5520 S Westmoreland RdJul 17, 2026Mcr office space for therapy. office space utilized for administrative operations, staff offices, client consultations, and individual therapy services. no medical procedures, overnight care, or educational classroom instruction are provided · 361 m away
- 4114 Mint WayMar 20, 20268x10x 8 ft shed for storage detached from building · 380 m away
- 5535 Red Bird Center DrMar 17, 2026We are replacing the entire drain line for building · 412 m away
- 4111 Mint WayJul 30, 2025Rebuilding electrical on the outside due to random people stealing it/ripping it out · 416 m away