10035 Edgecove Dr
Dallas, TX 75238
Home addition and remodel permitted on Edgecove Dr
City of Dallas records indicate a home addition and remodel at 10035 Edgecove Dr, with the main alteration and addition permit filed March 30, 2026. Follow-up permits cover electrical work, plumbing, and ducts for the new area, with the latest filing dated June 15, 2026.
Summarized from City of Dallas records · updated Jun 15, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jun 15, 2026
- since Mar 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsMove and relocate the electrical meter per the electrical plan. provide and install a new electrical panel. rough in new addition to home with can lights, switches, and receptacles
Move and relocate the electrical meter per the electrical plan. provide and install a new electrical panel. rough in new addition to home with can lights, switches, and receptacles
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 10035 Edgecove Dr
What is being built at 10035 Edgecove Dr?
City of Dallas records describe a home addition and remodel. The main residential alteration and addition permit, RES-ALT-ADD-26-000408, was filed March 30, 2026.
When was the home addition permitted?
The main permit was filed March 30, 2026. Related electrical, plumbing, and mechanical permits followed between May 5 and June 15, 2026.
What electrical work is planned at 10035 Edgecove Dr?
A May 5, 2026, residential electrical permit describes relocating the meter, installing a new electrical panel, and roughing in electrical work for the addition.
Are there plumbing permits for the Edgecove Dr addition?
Yes. A residential plumbing permit filed May 21, 2026, covers plumbing associated with the remodel and addition under permit RES-ALT-ADD-26-000408.
What does the mechanical permit cover at 10035 Edgecove Dr?
The June 15, 2026, residential mechanical permit describes adding ducts for the new area.
Also being built nearby
All of 75238- 10048 Edgecove DrMar 27, 2026Water heater replacement, + new drain line · 27 m away
- 10018 Edgecove DrMay 11, 2026This will be to replace the sewer line in the front of the house 40 feet long from house to city tap · 30 m away
- 10006 Edgecove DrJul 23, 2025Upgrading electrical service · 48 m away
- 10032 Milltrail DrMar 31, 2026Perform gas pressure test · 85 m away
- 10023 Milltrail DrAug 9, 2026Replace gas service line from meter to home · 99 m away
- 9956 Faircrest DrSep 28, 2026Gas test · 113 m away
- 10342 Trailcliff DrDec 29, 20255 ton el18xpv communicating inverter and ,matching 410a coil horizontal only use existing furnace and zoning components · 121 m away
- 9938 Faircrest DrFeb 20, 2026After speaking with james woodford, this new permit is being created to complete the final electrical inspection related to master permit#res-alt-add-25-000756 and electrical permit #res-elc-25-003167. this is the electrical work for a patio addition that has already been inspected and passed for all phases up to final electrical · 124 m away
- 10012 Faircrest DrAug 7, 2026Gas repair and gas test · 138 m away
- 9942 Edgecove DrDec 2, 2025Remove all exposed cast-iron sewer piping. furnish and install all necessary sch. 40 pvc pipe and fittings to replace pipingbeneath the house to the city tie in · 153 m away
- 9935 Edgecove DrOct 13, 2026Re-roof · 166 m away
- 9942 Milltrail DrAug 7, 2026Gas test · 176 m away