10312 Mapleridge Dr
Dallas, TX 75238
10312 Mapleridge Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 10312 Mapleridge Dr, Dallas, TX 75238 since March 27, 2025. The most recent, filed April 4, 2025, covers: “Replace hvac system”.
Compiled from City of Dallas records · updated Apr 4, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Apr 4, 2025
- since Mar 27, 2025
- Largest scope
- —
- Listed value
- $25K
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 10312 Mapleridge Dr
What is being built at 10312 Mapleridge Dr?
The latest filing (City of Dallas permit 2504043065_199358070-001, April 4, 2025) covers replace hvac system.
How many permits and filings does 10312 Mapleridge Dr have?
2 filings across 2 projects, from March 27, 2025 to April 4, 2025.
How much is the construction at 10312 Mapleridge Dr worth?
Permits at this address list about $25K in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 10312 Mapleridge Dr?
Yes. Nearby filings include 10322 Mapleridge Dr (80ft tunnel for drain replacement, Jun 10, 2026); 10328 Mapleridge Dr (foundation repair installing 9 helical piers to correct the deflection of the slab, Jul 29, 2026); 10318 Chesterton Dr (removing existing shingles down to decking and replacing with new, Oct 22, 2025).
How do I get alerts for new permits at 10312 Mapleridge Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 10322 Mapleridge DrJun 10, 202680ft tunnel for drain replacement · 14 m away
- 10328 Mapleridge DrJul 29, 2026Foundation repair installing 9 helical piers to correct the deflection of the slab · 22 m away
- 10318 Chesterton DrOct 22, 2025Removing existing shingles down to decking and replacing with new · 95 m away
- 10236 Mapleridge DrAug 21, 2025Under slab sewer replacement · 103 m away
- 10306 Estate LnOct 6, 2026Remove existing shingles and replace with new shingles · 106 m away
- 10229 Mapleridge DrMay 20, 2026Under slab sewer repair · 115 m away
- 10235 Chesterton DrFeb 13, 2026Gas test · 135 m away
- 10415 Mapleridge DrAug 10, 2026Gas relay outside of house · 138 m away
- 9918 Kirkhaven DrNov 19, 2020Remove existing roof and install new roof · 138 m away
- 10416 Mapleridge DrFeb 16, 2026Whole home sewer repipe/reroute with yard sewer · 141 m away
- 10215 Chesterton DrAug 26, 2025200amp overhead service, 200 amp main breaker disconnect, indoor panel replacement · 158 m away
- 10406 Estate LnSep 18, 2025Gas test for meter release · 165 m away