10529 Plumwood Pkwy
Dallas, TX 75238
10529 Plumwood Pkwy: 1 project on record
City of Dallas lists 1 filing across 1 project at 10529 Plumwood Pkwy, Dallas, TX 75238. The most recent, filed March 15, 2025, covers: “residential construction”.
Compiled from City of Dallas records · updated Mar 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 15, 2025
- since Mar 15, 2025
- Largest scope
- —
- Listed value
- $22K
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 10529 Plumwood Pkwy
What is being built at 10529 Plumwood Pkwy?
The latest filing (City of Dallas permit 2503153015_198986142-001, March 15, 2025) covers residential construction.
How many permits and filings does 10529 Plumwood Pkwy have?
1 filing across 1 project, from March 15, 2025 to March 15, 2025.
How much is the construction at 10529 Plumwood Pkwy worth?
Permits at this address list about $22K in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 10529 Plumwood Pkwy?
Yes. Nearby filings include 8679 Fanellan Wood Pl (tankless swap, Mar 2, 2026); 8680 Fanellan Wood Pl (5 ton standard plus horizontal gas system, Oct 7, 2026); 8666 Fanellan Wood Pl (replace 5ton base horizontal coil/ condenser, Jun 9, 2025).
How do I get alerts for new permits at 10529 Plumwood Pkwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 8679 Fanellan Wood PlMar 2, 2026Tankless swap · 24 m away
- 8680 Fanellan Wood PlOct 7, 20265 ton standard plus horizontal gas system · 26 m away
- 8666 Fanellan Wood PlJun 9, 2025Replace 5ton base horizontal coil/ condenser · 33 m away
- 10617 Le Mans DrMay 13, 202610 ft lineal feet of sill plate18 ft lineal feet of rim joist45.25 ft lineal feet of floor joist · 78 m away
- 8664 Ballifeary PlMar 23, 20264 ton gas horizontal hvac system swap out · 80 m away
- 8607 Ballifeary PlNov 20, 2025Replace 5-ton hvac system · 87 m away
- 8727 Lullwater DrNov 3, 2026Install fixtures and main gas line · 125 m away
- 10639 Plumwood PkwySep 23, 2026We are installing a new 240 volt 60 amp circuit and a new ev charger. this new ev charger will be hardwired and installed next to the panel in the garage · 176 m away
- 8847 Larchwood DrSep 17, 2025New construction plumbing · 177 m away
- 10555 Le Mans DrJun 10, 20265 single press concrete piers with rebar reinforcement11 ft lineal feet of sill plate · 180 m away
- 8863 Larchwood DrAug 3, 2026New 1" gas line installation. the 1" gas riser connection will be completed from underneath the home, where a new union and shutoff valve will be installed instead of locating them outside the home · 179 m away
- 8843 Larchwood DrSep 1, 2026Install 8' cedar fence on steel posts · 184 m away