10620 E Northwest Hwy
Dallas, TX 75238 · Linhope Companies INC
Interior remodel for a new dental office
Dallas permits indicate an interior remodel for a new dental office at 10620 E Northwest Hwy. The first listed permit was filed November 18, 2025, for the remodel; later permits cover electrical, mechanical, plumbing and medical-gas work, with the latest filed March 26, 2026.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Mar 26, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Mar 26, 2026
- since Jul 19, 2024
- Largest scope
- 13,086 sf
- Estimated cost
- $2.0M
- state registration
Where this project stands
In state plan reviewGoddard School Dallas
13,086 sq ft · $2.0M est.
- RegisteredJul 19, 2024
- Plan reviewnow
- ConstructionSep '24 – May '25
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 2 phone numbers
Permit & project history
6 projectsInterior renovation of an existing building. — the goddard school
TDLR project registrationRenovation/AlterationProject Registered13,086 sq ft$2.0M est.- Project #
- TABS2024023436
- Tenant / owner
- Goddard School Dallas
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 10620 E Northwest Hwy
What is being built at 10620 E Northwest Hwy?
Dallas permits describe an interior remodel for a new dental office. Related permits cover electrical, mechanical, plumbing and medical-gas work.
When was work permitted at 10620 E Northwest Hwy?
The first listed permit, COM-ALT-ADD-25-001696, was filed November 18, 2025, for an interior remodel for a new dental office. The latest listed permit, COM-PLM-26-001180, was filed March 26, 2026, for medical gas.
Is a dental office opening at 10620 E Northwest Hwy?
A November 18, 2025, Dallas permit describes an interior remodel for a new dental office. The records do not give an opening date.
What does the medical-gas permit at 10620 E Northwest Hwy cover?
The March 26, 2026, permit, COM-PLM-26-001180, is described as “Med gas.” Another plumbing permit filed December 16, 2025, covers new plumbing and medical gas.
What's being remodeled near The UPS Store on E Northwest Highway?
Permits for 10620 E Northwest Hwy indicate an interior remodel for a new dental office, with related electrical, mechanical and plumbing work. The UPS Store is listed about 103 meters away.
Is the project at 10620 E Northwest Hwy a medical office?
The permits describe a new dental office and include medical-gas work. The records do not identify a specific operator.
Also being built nearby
All of 75238- 10620 E Northwest HwyJan 19, 2021Gas relay or repair with test
- 10620 E NW Hyw · Linhope Companies INCNov 10, 2025Barnett, mariya — renovation/alteration — interior remodel for new dental office
- 10622 E Northwest HwyJan 14, 2026Dsst goddard school fence installation of an 8' tall 145' length composite fence with gate · 3 m away
- 10666 E NW Hwy · Aradi Holdings, LLCNov 20, 2024Wash masters dallas northwest highway remodel — renovation/alteration — remodel existing cvs store into a tunnel car wash with indoor vacuum area · 69 m away
- 10675 E NW Highway · Wf Northview Plaza LLCJun 3, 2026The ups store - dallas, tx #8345 — renovation/alteration — interior renovation for new ups store · 103 m away
- 10675 E Northwest HwyNov 4, 2026Gas test for ballet north texas · 103 m away
- 10677 E Northwest HwyJan 7, 2026Repair gas leak on roof next to rtu it's supplying · 105 m away
- 10677 E Northwest Highway · Wf Northview Plaza LLCDec 5, 2024Kroger #511 wiw remodel 2025 — renovation/alteration — minor interior remodel of an existing grocery store. interior scope of work primarily consists of new and relocated equipment/ fixtures · 105 m away
- 10524 E Northwest HwyFeb 21, 2026Re-roof on property as per insurance. metal roof as exisiting · 144 m away
- 10531 E Northwest HwyOct 1, 2026The total building is 8300sqft but only suite a/peak zone fitness (3300sqft) will be vacant come 09/30/26. they have terminated their utility services on 09/30/26 and ideally, i'd like to have electricity to the space to clean, show prospective tenants and run the hvac until a new tenant is secured. it is unclear how long that will take. the water bill is already in our business name (davmar checker square llc) and has been for years. we are not wanting gas to the space at this time. we may change our mind if it remains vacant when the colder months hit. peak zone fitness hopes to have all of its equipment out of the space by 09.28,26, but they have until the 30th. hopefully they do not abandon any of their equipment and leave it for me to deal with. either way, they are no longer paying rent or utilities starting 10/1/26. therefore, i'm requesting a city inspection around september 29th or 30th, which is required for the new electicity services to be put in our business name (davmar checker square llc) come 10/1/26 · 150 m away
- 8550 Plano RdOct 21, 2020Erect attached sign · 172 m away
- 8501 Lullwater DrAug 28, 2026We are only doing the roof portion just shingles nothing else · 194 m away
More medical facilities in 75238, offices in 75238, schools & daycares in 75238.