7777 Forest Lane
Dallas, TX 75238 · Hcp Dr Mcd LLC
Tenant finish-out registered for Medical City Dallas Building B
A 1,554-square-foot tenant finish-out in Medical City Dallas Building B was registered with the Texas Department of Licensing and Regulation on April 2, 2026. The registration lists an applicant-estimated project cost of $217,560. The project record, TABS2026016655, is marked Inspection Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 2, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 2, 2026
- since Apr 2, 2026
- Largest scope
- 1,554 sf
- Estimated cost
- $218K
- state registration
Where this project stands
Inspected · closing outSpec Suite B-224
1,554 sq ft · $218K est.
- RegisteredApr 2, 2026
- Plan review
- ConstructionMay '26 – Sep '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectA 1,554 sq ft tenant finish out within medical city dallas building b in dallas, texas. — medical city dallas building b
TDLR project registrationRenovation/AlterationInspection Complete1,554 sq ft$218K est.- Project #
- TABS2026016655
- Tenant / owner
- Spec Suite B-224
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7777 Forest Lane
What is being built at 7777 Forest Lane in Dallas?
A 1,554-square-foot tenant finish-out is planned for Spec Suite B-224 in Medical City Dallas Building B. The TDLR project registration is TABS2026016655.
Is this a new building at Medical City Dallas?
No new building is listed. The registration describes an interior tenant finish-out within Medical City Dallas Building B.
When was the Medical City Dallas Building B project filed?
The project was registered with TDLR on April 2, 2026.
How large is the Spec Suite B-224 finish-out?
The registered tenant finish-out covers 1,554 square feet.
How much is the Medical City Dallas Building B project estimated to cost?
The applicant's TDLR estimate is $217,560 for the project.
What is the status of the Spec Suite B-224 project?
The TDLR record lists the project status as Inspection Complete.
Also being built nearby
All of 75238- 7777 Forest Ln · Hcp Dr Mcd LLCSep 3, 2025Mcd nuc med renovation — renovation/alteration — renovation to an existing ct suite to replace equipment and make minor finish upgrades
- 7777 Forest Ln · Columbia Hospital At Medical City Dallas Subsidiary, L.p. D/B/A Medical City DallasJul 21, 2026Medical city dallas hospital building a – starguide nuc med renovation — renovation/alteration — the scope of work includes design, documentation, and construction administration services for the renovation of the existing ct room to enlarge and accommodate a stargate ct. renovations will be located on the 2nd floor of building a
- 7777 Forest Ln · Hcp Dr Mcd LLCNov 11, 2026Equipment change-out & minor renovations. the project scope will include the demolition and construction of non-loadbearing interior partitions, suspended ceilings, flooring, and other finishes. existing building mep&s systems will be modified to support new equipment including new conduits, mop sink, and lighting
- 7777 Forrest Lane · Hcp Dr Mcd LLCNov 19, 2025Mcd cicu_phase 3 cicu — renovation/alteration — interior major renovation to add pediatric cicu patient rooms and associated support spaces
- 7777 Forest Lane C-760 · Hcp Dr Mcd LLCJan 30, 2025Texas breast specialists — renovation/alteration — interior medical office renovation
- 7777 Forest Lane · Hcp Dr Mcd LLCJul 8, 2026Dr. braidfoot — renovation/alteration — a 1,270 sq ft tenant renovation for dental use in medical city dallas building b within dallas, texas
- 7777 Forest LnOct 26, 2026Mcr used near by address of 7777 forest ln suite c 808 and need to create an address of 7777 forest ln suite c 810 dallas tx 75230
- 7821 Forest LnDec 29, 2020Install fence · 87 m away
- 7919 Forest TrlSep 16, 2026Gas pipe repipe under home · 128 m away
- 7738 Forest LnJun 14, 2025Install a half inch double check valve · 131 m away
- 7927 Forest LnJun 2, 2026Apt. 1605(t) building- changeout existing system. install 2 ton split system · 134 m away
- 7722 Forest LnJul 10, 2025Change out burnt disconnect at this restaurant · 145 m away