7939 Nimrod Trl
Dallas, TX 75238
New single-family home permitted at 7939 Nimrod Trl
City of Dallas records indicate a new single-family home is being built at 7939 Nimrod Trl after a permit to demolish the existing structure was filed on August 6, 2025. The new-construction permit followed on August 11, 2025, with plumbing and electrical permits filed in September 2025 and plumbing, mechanical, and electrical permits filed in February 2026.
Summarized from City of Dallas records · updated Oct 26, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Oct 26, 2026
- since Aug 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
8 projectsSources: City of Dallas
Questions about 7939 Nimrod Trl
What is being built at 7939 Nimrod Trl?
City of Dallas permits indicate a new single-family home. The city filed new-construction permit RES-NEW-25-000524 on August 11, 2025.
Was a structure demolished at 7939 Nimrod Trl?
Yes. The city filed demolition permit RES-DEM-25-000293 on August 6, 2025, for demolition of an existing structure.
When was the new home at 7939 Nimrod Trl permitted?
The new-construction permit was filed on August 11, 2025. Plumbing and electrical permits followed in September 2025.
What construction permits were filed for 7939 Nimrod Trl in 2026?
On February 13, 2026, the city filed permits for plumbing, a complete HVAC system with ductwork, and new-construction electrical work.
Was a fence permitted at 7939 Nimrod Trl?
A residential accessory structure permit filed October 26, 2026, describes installing a wood fence around the perimeter of the house.
Also being built nearby
All of 75238- 7912 Deer Trail DrNov 19, 2025Driveway with approach with sidewalk on side of houseapproach of 13'x21'6"driveway of 21'6"x29'6"83'x3 · 89 m away
- 7921 Deer Trail DrJul 23, 2025Replace 2 ton complete · 101 m away
- 7933 Deer Trail DrJun 27, 2025Installing an ev charger center of the garage back wall. surface mount conduit · 108 m away
- 7911 Eagle TrlMar 19, 2026Install 12 pilings · 110 m away
- 7937 Deer Trail DrOct 15, 2026- new sewer line from half of the yard to the house 42ft.- two way cleanouts 4x3- up to 50 feet long of tunnel for new drains- up to 110 feet long trench for new sewer line.- drains total ? 2 toilets, 3 drains for 2nd floor, 4 sinks, 1 laundry,1 shower, 1 free standing tub and kitchen.- main water line from half of the yard to the house with prv valve and access for irrigation system · 111 m away
- 8003 Eagle TrlApr 3, 2026Install of 2.5 ton 9-speed ecm air handler only. seer: 14 seer stage · 113 m away
- 7924 Eagle TrlNov 3, 2020Install swimming pool · 116 m away
- 7918 Eagle TrlAug 19, 2026Hvac changeout: replace existing upstairs 3-ton 18 seer condenser · 118 m away
- 7912 Eagle TrlJun 15, 2026Installing complete system · 120 m away
- 8721 Thunderbird LnAug 21, 2026Service upgrade · 126 m away
- 8710 Thunderbird LnDec 17, 2025Replace 40 gallon gas water located in hallway · 128 m away
- 8715 Thunderbird LnOct 30, 2025Replacing gas tankless water heater · 135 m away