9006 Hackney Ln
Dallas, TX 75238
9006 Hackney Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 9006 Hackney Ln, Dallas, TX 75238. The most recent, filed December 31, 2020, covers: “Install fence”.
Compiled from City of Dallas records · updated Dec 31, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 31, 2020
- since Dec 31, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9006 Hackney Ln
What is being built at 9006 Hackney Ln?
The latest filing (City of Dallas permit 2012281076, December 31, 2020) covers install fence.
How many permits and filings does 9006 Hackney Ln have?
1 filing across 1 project, from December 31, 2020 to December 31, 2020.
Is there other construction near 9006 Hackney Ln?
Yes. Nearby filings include 8919 Hackney Ln (remodel existing plumbing, Dec 19, 2025); 11150 Paddock Cir (3-ton gas level 2 complete system replacement, Aug 18, 2026); 11065 Quail Run (replacement of natural gas water heater located in a utility closet. t&p and drain pan pipe will be relocated to an exterior wall, Oct 25, 2026).
How do I get alerts for new permits at 9006 Hackney Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 8919 Hackney LnDec 19, 2025Remodel existing plumbing · 67 m away
- 11150 Paddock CirAug 18, 20263-ton gas level 2 complete system replacement · 95 m away
- 11065 Quail RunOct 25, 2026Replacement of natural gas water heater located in a utility closet. t&p and drain pan pipe will be relocated to an exterior wall · 103 m away
- 11039 Quail RunSep 29, 2025Condenser installation · 108 m away
- 11044 Quail RunOct 30, 2025Repair a gas leak locate from the gas meter to the house · 132 m away
- 11027 Quail RunOct 23, 2026Replace 3 ton gas hvac unit · 133 m away
- 11111 Quail RunApr 24, 202665ft sewer trench plus access and 10ft tunnel trench front yard to city tap that’s 6ft deep 35ft of sewer trench 4-5ft down · 134 m away
- 11126 Paddock CirAug 19, 2026Up to 70' & replace sewer service - up to 30 · 135 m away
- 11038 Quail RunOct 13, 2026Mcr new in-ground 264 sq ft concrete pool and associated equipment and pad · 141 m away
- 11127 Paddock CirSep 29, 2020Electrical remodel · 148 m away
- 11111 Paddock CirJul 29, 2026Complete sewer line replacement in yard and under home. we will replace all cast iron under the home with schedule 40 pvc strapped properly under the slab with clevis hangers. we will pull toilets and install new toilet flanges. we will also add new double clean outs and new schedule 40 pvc yard line.house will hold hydrostatic test at time of inspection · 165 m away
- 11114 Quail RunFeb 6, 2026Sewer line drain · 167 m away