Residential work at 9522 Still Creek Ln
City of Dallas records show residential work at 9522 Still Creek Ln, including plumbing for a two-story house, electrical work, a new HVAC installation and an 8-foot cedar fence. These permits were filed from February through October 2026; a new-construction record filed in November 2025 says the project had been approved in the previous system.
Summarized from City of Dallas records · updated Oct 23, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Oct 23, 2026
- since Nov 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projects11/3/25 this building project record number will be changed to withdrawn/closed/denied due to the project being approved as shown on our previous system posse. no inspections required on this record. no more extension notifications shall be sent a.ipina
11/3/25 this building project record number will be changed to withdrawn/closed/denied due to the project being approved as shown on our previous system posse. no inspections required on this record. no more extension notifications shall be sent a.ipina
City of Dallas permitResidential New Construction Permit
Sources: City of Dallas
Questions about 9522 Still Creek Ln
What is being built at 9522 Still Creek Ln?
Dallas permits list residential work, including plumbing for a two-story house, electrical work, a new HVAC installation and an 8-foot cedar fence. The records do not provide a project size or total cost.
Is a new house being built at 9522 Still Creek Ln?
A residential new-construction permit was filed on November 14, 2025. Its note says the project had been approved in the previous system and that this record would be closed, with no inspections required on it.
What permits were filed for 9522 Still Creek Ln?
Dallas records list electrical work filed February 10, 2026, plumbing filed February 18, HVAC filed April 3 and an 8-foot cedar fence filed October 23.
When were permits filed for 9522 Still Creek Ln?
The records span November 14, 2025, through October 23, 2026. The latest listed filing is for an 8-foot cedar fence.
What does the new-construction permit record say about 9522 Still Creek Ln?
Record RES-NEW-25-000204, filed November 14, 2025, says the building project had been approved in the previous system. The note says no inspections were required on that record.
Also being built nearby
All of 75238- 9518 Still Creek LnOct 2, 2025Gas line to pool heater · 17 m away
- 9526 Still Creek LnNov 14, 202511/3/25 this building project record number will be changed to withdrawn/closed/denied due to the project being approved as shown on our previous system posse. no inspections required on this record. no more extension notifications shall be sent a.ipina · 18 m away
- 9523 Still Creek LnNov 18, 2026Install new construction plumbing · 49 m away
- 9515 Still Creek LnNov 26, 2025Installing 26kw generator · 53 m away
- 9245 Highedge CirJul 21, 2025Remove existing roofing and replace with like kind and quality · 75 m away
- 9506 Still Creek LnNov 6, 2026Electrical rough and trim · 78 m away
- 9216 Highedge CirApr 8, 2026Hvac change out – remove & replace 1 full system + no new duct work + attic installation · 80 m away
- 9505 Sunset Ridge RdSep 17, 20268 ft tall board on board fence with steel posts · 95 m away
- 9507 Mossridge DrOct 21, 2026Double check valve replacement · 102 m away
- 9511 Mossridge DrJan 14, 2021Electrical repairs · 109 m away
- 9317 Crestedge DrDec 7, 2020Remove existing roof and install new roof · 110 m away
- 9326 Crestedge DrJun 4, 2026Replace gas line in the yard · 128 m away