9605 Covemeadow Dr
Dallas, TX 75238
Electrical upgrades and gas-line work at 9605 Covemeadow Dr
Residential permits filed May 15, 2026, cover safely abandoning a gas line and replacing the electrical service and panel, updating grounding, and installing surge protection at 9605 Covemeadow Dr. The records describe home repairs and upgrades, not a new building.
Summarized from City of Dallas records · updated May 15, 2026
- Projects
- 3
- 3 filings
- Latest filing
- May 15, 2026
- since May 15, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 9605 Covemeadow Dr
What is being built at 9605 Covemeadow Dr?
The records do not show a new building. Permits filed May 15, 2026, cover gas-line abandonment and electrical service and panel work.
What work is planned at 9605 Covemeadow Dr in Dallas?
The permits describe safely abandoning a gas line, replacing the electrical service and panel, updating grounding, and installing surge protection.
When were permits filed for 9605 Covemeadow Dr?
The City of Dallas records show two permits filed May 15, 2026: plumbing permit RES-PLM-26-005094 and electrical permit RES-ELC-26-002822.
Is a new home being built at 9605 Covemeadow Dr?
The available records document work on an existing residence, not construction of a new home. They list gas-line and electrical upgrades.
What electrical work is permitted at 9605 Covemeadow Dr?
Electrical permit RES-ELC-26-002822, filed May 15, 2026, covers replacing the service and panel, updating grounding, and installing surge protection.
What gas work is permitted at 9605 Covemeadow Dr?
Plumbing permit RES-PLM-26-005094, filed May 15, 2026, describes safely abandoning a gas line. A separate gas relay or repair with test was recorded there on August 7, 2020.
Also being built nearby
All of 75238- 9615 Covemeadow DrFeb 2, 2026Replace existing cast iron under the home as well as the yard sewer line to city connection · 35 m away
- 9614 Covemeadow DrOct 13, 2025Replaced the existing tankless water heater located in the attic with a new tankless water heater · 38 m away
- 9615 Brentgate DrSep 14, 2020Replace or modify existing hvac · 96 m away
- 9507 Dartridge DrSep 21, 2026Remove old composition shingles & install new composition shingles · 96 m away
- 9605 Brentgate DrJul 24, 2026Gas leak repair · 97 m away
- 9619 Brentgate DrDec 9, 2020Install swimming pool · 98 m away
- 9515 Dartridge DrDec 3, 2020Addition to sfd · 99 m away
- 9614 Brentgate DrNov 9, 2026Foundation repair is being recommended at the property to include installation of steel shims between structural support posts and beams, installation of pad and blocks, and installation of new sill plates · 108 m away
- 9486 Dartridge DrDec 29, 2020Electrical repairs · 110 m away
- 9624 Brentgate DrNov 12, 2025Install water heater · 115 m away
- 9639 Brentgate DrAug 24, 2026It is recommended at the home to install steel shims and beams · 127 m away
- 9480 Dartridge DrMay 14, 20251.5 ton evap coil and condenser · 133 m away