9715 Walnut Hill Ln
Dallas, TX 75238
Phased office and retail construction permitted on Walnut Hill Lane
City of Dallas records indicate phased new construction for office and retail space at 9715 Walnut Hill Ln. Permits were filed from March 13 through June 11, 2026, including records for first- and second-floor work, Phase 3, and site work.
Summarized from City of Dallas records · updated Jun 11, 2026
- Projects
- 14
- 14 filings
- Latest filing
- Jun 11, 2026
- since Mar 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
14 projectsIn person qteam meeting 9.3.2025 (1:30 pm)2 level building with retail on the ground level and office on the second level
In person qteam meeting 9.3.2025 (1:30 pm)2 level building with retail on the ground level and office on the second level
City of Dallas permitCommercial New Construction Permit
Sources: City of Dallas
Questions about 9715 Walnut Hill Ln
What is being built at 9715 Walnut Hill Lane in Dallas?
City of Dallas records classify the project as office and retail space and show permits for phased new construction. The records do not identify a tenant.
When were permits filed for 9715 Walnut Hill Lane?
The first listed filing was March 13, 2026, and the latest was June 11, 2026.
Are there permits for different phases of construction at 9715 Walnut Hill Lane?
Yes. March 13, 2026, permits include descriptions for the first floor, second floor, Phase 3, and site work. Additional phase-new-construction permits were filed May 15 and June 11, 2026.
Is a new office building being built at 9715 Walnut Hill Lane?
The project categories include office and retail space, and City of Dallas records show phased new-construction permits. The records provided do not specify the building's size.
What do the June 2026 permits for 9715 Walnut Hill Lane cover?
Four City of Dallas phase-new-construction permits were filed June 11, 2026: COM-PH-NEW-26-000663 through COM-PH-NEW-26-000666. Their descriptions do not provide additional project details.
Also being built nearby
All of 75238- 9715 Walnut Hill · Highlands VillageJul 29, 2025Highlands village — new construction — retail ground floor and office 2nd floor
- 9624 Ravensway DrAug 15, 2025200 amp panel and meter base replacement · 73 m away
- 9656 Ravensway DrAug 6, 2026Replace 50 gal gas water heater · 80 m away
- 9657 Crestedge DrNov 10, 2025Gas meter relocate · 118 m away
- 9709 Fieldcrest DrDec 3, 2025Gas meter relocate · 137 m away
- 9653 Fieldcrest DrJan 26, 2024Rsvp · 138 m away
- 9640 Angleridge RdJul 7, 2025Adding restroom · 142 m away
- 9635 Angleridge RdJun 29, 2026Roof replacement · 149 m away
- 9645 Angleridge RdFeb 27, 2026Home sewer repipe · 155 m away
- 9655 Angleridge RdJan 2, 2026Gas main service replacement from meter to house · 163 m away
- 9595 Highedge DrDec 1, 2020Install lawn sprinkler · 166 m away
- 9641 Fieldcrest DrOct 16, 2026Install a pressure-reducing valve (prv) downstream of the city water meter, along with an accessible, serviceable ball shutoff valve, in a new valve box in the front yard. install an expansion tank at the tankless water heater to accommodate thermal expansion after installation of the prv · 167 m away