9723 Queenswood Ln
Dallas, TX 75238
9723 Queenswood Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 9723 Queenswood Ln, Dallas, TX 75238. The most recent, filed July 1, 2025, covers: “Water heater, replace underground sewer”.
Compiled from City of Dallas records · updated Jul 1, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 1, 2025
- since Jul 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9723 Queenswood Ln
What is being built at 9723 Queenswood Ln?
The latest filing (City of Dallas permit RES-PLM-25-002018, July 1, 2025) covers water heater, replace underground sewer.
How many permits and filings does 9723 Queenswood Ln have?
1 filing across 1 project, from July 1, 2025 to July 1, 2025.
Is there other construction near 9723 Queenswood Ln?
Yes. Nearby filings include 9711 Queenswood Ln (repipe sewer line under slab 32 foot tunnel method, Oct 15, 2026); 9741 Queenswood Ln (mcr with battery third party approved. installing a 6.09 kw pv system and (1) tesla inc. 1707000-xx-y inverter/battery. also installing a span service panel, Nov 5, 2026); 9747 Queenswood Ln (replace building drains from cast iron to pvc, Jun 8, 2026).
How do I get alerts for new permits at 9723 Queenswood Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 9711 Queenswood LnOct 15, 2026Repipe sewer line under slab 32 foot tunnel method · 38 m away
- 9741 Queenswood LnNov 5, 2026Mcr with battery third party approved. installing a 6.09 kw pv system and (1) tesla inc. 1707000-xx-y inverter/battery. also installing a span service panel · 39 m away
- 9747 Queenswood LnJun 8, 2026Replace building drains from cast iron to pvc · 52 m away
- 9855 Walnut Hill LnJul 30, 2026Qteam meeting 8.19.26 (9 am) - new commercial restaurant - braum's · 83 m away
- 9707 Robin Hill CirNov 11, 2025Electrical work for patio cover · 130 m away
- 9932 Larchbrook DrApr 30, 2026Hvac replacement. install 5 ton gas horizontal system · 134 m away
- 9731 Robin Hill CirJan 5, 2026Convert tub to a shower, new valve and pan · 144 m away
- 9743 Robin Hill CirMar 16, 2026We are doing originally the 30 ft yard line and now we are also adding 35 ft tunnel with 35 ft of building drain replacement and also a 20 ft. kitchen drain re route!!!!!!!! · 152 m away
- 9938 Larchbrook DrMay 29, 2026Replacement of existing hvac system with lennox 2 ton merit heat pump system, 14.3 seer2, (a2l) · 156 m away
- 9850 Walnut Hill LnOct 29, 2025Installation of one 1/2" rpz valve for coke line by mop sink · 163 m away
- 9914 Greenfield DrAug 12, 2026Hvac 5 ton full system replacement · 164 m away
- 9920 Greenfield DrDec 2, 2025Gas test · 172 m away