9728 Windledge Dr
Dallas, TX 75238
Gas line replacement permitted at 9728 Windledge Dr
A residential plumbing permit covers replacing the gas line from the meter to the house at 9728 Windledge Dr. The City of Dallas issued the permit on August 3, 2026; the record does not list a project cost or square footage.
Summarized from City of Dallas records · updated Aug 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 3, 2026
- since Aug 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9728 Windledge Dr
What work is planned at 9728 Windledge Dr?
A City of Dallas residential plumbing permit covers replacing the gas line from the meter to the house.
When was the gas line replacement permitted?
The permit was filed on August 3, 2026.
What is the permit number for 9728 Windledge Dr?
The permit number is RES-PLM-26-008046.
Is a new home being built at 9728 Windledge Dr?
The record describes gas line replacement at a residence, not construction of a new home.
What is being worked on near Calvary Lutheran Church?
At 9728 Windledge Dr, about 227 meters from Calvary Lutheran Church, a permit covers replacing the gas line from the meter to the house.
Also being built nearby
All of 75238- 9734 Windledge DrDec 31, 20259 trenching (under sidewalk), 18.4 lf french drain-4 pvc, 27lf french drain discharge line, 1.1 lf surface drain discharge line · 10 m away
- 9740 Windledge DrMay 13, 2026186 linear footage 8ft board on board cedar fence · 20 m away
- 9739 Estate LnOct 24, 2025Gas test · 86 m away
- 10059 Ravensway DrJul 15, 2026Dsst risd- northlake es full turnkey installation of a steel and fabric shade structure with reenforced concrete foundations · 97 m away
- 9740 Estate LnAug 13, 2026Installed new meter base, raceway, mains wiring (tree damage, fell on electrical lines) · 99 m away
- 9722 Estate LnJun 30, 2026The main sewer line requires conversion from cast iron to pvc this would require an exterior access hole and tunnel below apron/skirt of pier and beam structure, removal and replacement with permit, suspension with hangers · 101 m away
- 9705 Estate LnNov 12, 2025Re-roof (shingles only) · 102 m away
- 9809 Windledge DrMar 10, 2026Full under pier & beam sewer pipe replacementexcavation to, re-route / replace (front middlebathroom, half middle bathroom, back middle bathroom, kitchen &washer line under home sewer pipes only) of the plumbing sewerdrainpipe under the home only. our plan reroutes the under-slab/home sewer pipe and connects it back into the yard sewer line at thecity tap area , effectively replacing the yard sewer line as well · 158 m away
- 9815 Windledge DrJul 30, 2026Main sewer replacement in crawl space · 168 m away
- 9733 Dartridge DrNov 12, 2026New install of hvac system with ducts · 177 m away
- 9743 Dartridge DrJan 20, 2026Replacing approx 50ft of gas line · 178 m away
- 9727 Dartridge DrOct 27, 2025Gas test · 178 m away