9730 Ravensway Dr
Dallas, TX 75238
9730 Ravensway Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 9730 Ravensway Dr, Dallas, TX 75238. The most recent, filed November 3, 2020, covers: “Permanent electrical service”.
Compiled from City of Dallas records · updated Nov 3, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 3, 2020
- since Nov 3, 2020
- Largest scope
- —
- Listed value
- $1
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 9730 Ravensway Dr
What is being built at 9730 Ravensway Dr?
The latest filing (City of Dallas permit 2011033071, November 3, 2020) covers permanent electrical service.
How many permits and filings does 9730 Ravensway Dr have?
1 filing across 1 project, from November 3, 2020 to November 3, 2020.
How much is the construction at 9730 Ravensway Dr worth?
Permits at this address list about $1 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 9730 Ravensway Dr?
Yes. Nearby filings include 9734 Ravensway Dr (permanent electrical service, Nov 20, 2020); 9661 Angleridge Rd (new electrical for remodel of kitchen and garage, Oct 14, 2026); 9655 Angleridge Rd (gas main service replacement from meter to house, Jan 2, 2026).
How do I get alerts for new permits at 9730 Ravensway Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 9734 Ravensway DrNov 20, 2020Permanent electrical service · 5 m away
- 9661 Angleridge RdOct 14, 2026New electrical for remodel of kitchen and garage · 98 m away
- 9655 Angleridge RdJan 2, 2026Gas main service replacement from meter to house · 112 m away
- 9806 Ravensway DrMay 30, 2026Stabilizing homes foundation · 121 m away
- 9645 Angleridge RdFeb 27, 2026Home sewer repipe · 134 m away
- 9640 Angleridge RdJul 7, 2025Adding restroom · 135 m away
- 9660 Brentgate DrOct 29, 2025Two 50 gallon gas water heaters · 144 m away
- 9656 Ravensway DrAug 6, 2026Replace 50 gal gas water heater · 145 m away
- 9812 Ravensway DrOct 21, 2026We will perform approximately 130 linear feet of tunneling beneath the slab foundation to expose and replace the existing sewer piping throughout the home. the project will also include approximately 25 linear feet of yard excavation and sewer line replacement, along with the creation of three access holes in grass areas to provide entry points for the tunneling and replacement work. once the piping is exposed, we will remove the deteriorated cast iron and existing pvc sections within the replacement area and install approximately 130 feet of new pvc sewer piping beneath the home and 25 feet of new pvc sewer piping in the yard, for a total of approximately 155 linear feet of new sewer piping. the new sewer system will serve the existing plumbing fixtures and drain connections beneath the home and extend through the yard to the city sewer connection, providing a complete replacement of the home's main sewer system · 147 m away
- 9635 Angleridge RdJun 29, 2026Roof replacement · 157 m away
- 9659 Brentgate DrJun 5, 2025Running approximately 6 ft of gas line for pool heater · 157 m away
- 9830 Ravensway DrFeb 19, 2026Sewer line replacement · 179 m away