9915 Crestwick Dr
Dallas, TX 75238
9915 Crestwick Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 9915 Crestwick Dr, Dallas, TX 75238 since June 12, 2025. The most recent, filed June 20, 2025, covers: “Provide power from existing exterior switch for 4 can lights, 1 ceiling fan, and 1 outlet”.
Compiled from City of Dallas records · updated Jun 20, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 20, 2025
- since Jun 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsNsfaa-framing and deck constructionframe new deck using existing posts:install a 2x10 pressure-treated ledger board for secure attachment to the house.construct a double 2x10 exterior beam to support the structure.frame the deck with 2x6 joists spaced 16” on center, supported by posts at 6’ intervals.use joist hangers to secure all joists, ensuring durability and compliance with building codes.deck boards:install 5/4 pressure-treated deck boards in a picture frame and center joint design for a clean and professional appearance.secure deck boards with collated framing nails for a long-lasting finish.handrails and posts:frame handrails using 4x4 pressure-treated posts, spaced 6’ apart and securely fastened to the deck beam.install horizontal 2x6 boards and a 2x4 top board with 2”x2” balusters spaced 4” apart, ensuring safety and aesthetic appeal.construct the handrail to a height of 40 inches, meeting safety standards.stairs construction:frame 4’ wide stairs using 2x12 stringers and 2x6 treads for stability and durability.support stairs with 4x4 posts set into 24”x8” concrete footings.install matching handrails along the stairs with securely fastened 4x4 posts.posts for staircase:posts along the concrete staircase will sit on post brackets to raise the wood off the cement. this solution addresses the wall pulling in that area by reducing strain and eliminating potential wood rot, ensuring long-term structural stability.skirting and access door:install hardie lap siding for enhanced durability, using 2x4 studs for structural support.trim all corners with 1x4 boards.construct an access door near the stairs with a secure latch for convenient under-deck access.construction of an 18' x 20' gable roof patio cover, adhering to local building codes and industrysafety standards. the design ensures structural integrity, high-quality craftsmanship, andaesthetic compatibility with the existing home.project specifications:1. posts and footings:- materials: four (3) 6"x6" pressure-treated posts.- installation: posts will be set outside the current concrete slab in plastic-wrapped footings,12" in diameter and 34" deep, ensuring stability and protection from moisture.- aesthetic finish: posts will be wrapped in hardie board for durability and a clean, finishedlook.2. beams:- materials: double 2"x12" beams for robust structural support.- installation: beams will be securely fastened and wrapped in hardie board for weatherresistance and visual appeal.3. roof structure- rafters: 2"x8" roof rafters installed at 24" on-center spacing
Nsfaa-framing and deck constructionframe new deck using existing posts:install a 2x10 pressure-treated ledger board for secure attachment to the house.construct a double 2x10 exterior beam to support the structure.frame the deck with 2x6 joists spaced 16” on center, supported by posts at 6’ intervals.use joist hangers to secure all joists, ensuring durability and compliance with building codes.deck boards:install 5/4 pressure-treated deck boards in a picture frame and center joint design for a clean and professional appearance.secure deck boards with collated framing nails for a long-lasting finish.handrails and posts:frame handrails using 4x4 pressure-treated posts, spaced 6’ apart and securely fastened to the deck beam.install horizontal 2x6 boards and a 2x4 top board with 2”x2” balusters spaced 4” apart, ensuring safety and aesthetic appeal.construct the handrail to a height of 40 inches, meeting safety standards.stairs construction:frame 4’ wide stairs using 2x12 stringers and 2x6 treads for stability and durability.support stairs with 4x4 posts set into 24”x8” concrete footings.install matching handrails along the stairs with securely fastened 4x4 posts.posts for staircase:posts along the concrete staircase will sit on post brackets to raise the wood off the cement. this solution addresses the wall pulling in that area by reducing strain and eliminating potential wood rot, ensuring long-term structural stability.skirting and access door:install hardie lap siding for enhanced durability, using 2x4 studs for structural support.trim all corners with 1x4 boards.construct an access door near the stairs with a secure latch for convenient under-deck access.construction of an 18' x 20' gable roof patio cover, adhering to local building codes and industrysafety standards. the design ensures structural integrity, high-quality craftsmanship, andaesthetic compatibility with the existing home.project specifications:1. posts and footings:- materials: four (3) 6"x6" pressure-treated posts.- installation: posts will be set outside the current concrete slab in plastic-wrapped footings,12" in diameter and 34" deep, ensuring stability and protection from moisture.- aesthetic finish: posts will be wrapped in hardie board for durability and a clean, finishedlook.2. beams:- materials: double 2"x12" beams for robust structural support.- installation: beams will be securely fastened and wrapped in hardie board for weatherresistance and visual appeal.3. roof structure- rafters: 2"x8" roof rafters installed at 24" on-center spacing
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 9915 Crestwick Dr
What is being built at 9915 Crestwick Dr?
The latest filing (City of Dallas permit RES-ELC-25-000882, June 20, 2025) covers provide power from existing exterior switch for 4 can lights, 1 ceiling fan, and 1 outlet.
How many permits and filings does 9915 Crestwick Dr have?
2 filings across 2 projects, from June 12, 2025 to June 20, 2025.
Is there other construction near 9915 Crestwick Dr?
Yes. Nearby filings include 9906 Crestwick Dr (remove and replace shingles on roof, Apr 28, 2026); 9929 Crestwick Dr (replace gas service and gas test. atmos shut them down, Aug 13, 2026); 9618 Queenswood Ln (replace or modify existing hvac, Dec 29, 2020).
How do I get alerts for new permits at 9915 Crestwick Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75238- 9906 Crestwick DrApr 28, 2026Remove and replace shingles on roof · 21 m away
- 9929 Crestwick DrAug 13, 2026Replace gas service and gas test. atmos shut them down · 30 m away
- 9618 Queenswood LnDec 29, 2020Replace or modify existing hvac · 95 m away
- 9919 Lakemere DrJun 8, 2026Replace cast iron sewer line · 100 m away
- 9924 Lakemere DrAug 20, 2025Meter and riser repair · 112 m away
- 9940 Lakemere DrFeb 11, 202650 gal water heater replacement · 116 m away
- 9850 Crestwick DrDec 3, 2020Interior/ exterior remodel only · 135 m away
- 9847 Crestwick DrDec 3, 2025Replace 4 ton base upflow gas system · 142 m away
- 9846 Crestwick DrApr 8, 2026We will access the plumbing system beneath the home through the existing pier and beam crawlspace to reach the main sewer line serving the master and hall bathrooms. all defective sections of the main sewer line will be removed and replaced with new schedule 40 pvc piping, installed to proper grade to ensure optimal flow.we will repair all identified breaks in the toilet lead bends, hall lavatory drain, and hall tub drain. additionally, we will replace approximately 30 feet of the kitchen main line, including the section where the line is broken at the kitchen stack.the laundry line will be properly reconnected using approved fittings to ensure system integrity and proper drainage. the existing abandoned laundry line, which is currently leaking due to system failure, will be eliminated and permanently disconnected.we will also repair the break at the cleanouts, as this area will be accessible during the repair process · 143 m away
- 9934 Edgecliff CirOct 7, 2025Gas line to cabana and to gas heater · 161 m away
- 9830 Crestwick DrNov 9, 2026Nsfaa-9830 crestwick - construct a new sfd · 177 m away
- 9517 Aldwick DrFeb 5, 20262 toilets 2 lava gas line inside · 181 m away