13250 Emily Rd
Dallas, TX 75240
Repairs to 12 fire-damaged apartments at 13250 Emily Road
City of Dallas permits indicate reconstruction and repairs to 12 apartments damaged by fire and water at 13250 Emily Road. A repair permit was filed October 23, 2025, and additional plumbing, electrical and mechanical permits were filed from June through July 2026.
Summarized from City of Dallas records · updated Jul 7, 2026
- Projects
- 13
- 13 filings
- Latest filing
- Jul 7, 2026
- since Jun 23, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
13 projectsUnits 601, 602, 603, 604, 605, 606, 619, 620, 621, 622, 623, and 624. total of 12 units. installation of 2 ton condenser and 2 ton fan coil. includes duct work, and dryer exhaust
Units 601, 602, 603, 604, 605, 606, 619, 620, 621, 622, 623, and 624. total of 12 units. installation of 2 ton condenser and 2 ton fan coil. includes duct work, and dryer exhaust
City of Dallas permitCommercial Mechanical PermitMcr 12 units affected by fire and water. damaged interior finishes and exterior brick/stucco. install new electrical, plumbing, hvac, insulation, drywall, doors, fire suppression, roofing, and flooring
Mcr 12 units affected by fire and water. damaged interior finishes and exterior brick/stucco. install new electrical, plumbing, hvac, insulation, drywall, doors, fire suppression, roofing, and flooring
City of Dallas permitCommercial Alteration Addition PermitGas line installation from 2" main line, reduced down to 1 1/4 line to supply laundry room near leasing office
Gas line installation from 2" main line, reduced down to 1 1/4 line to supply laundry room near leasing office
City of Dallas permitCommercial Plumbing PermitMcr demolition 12 fire and water damaged interior finishes and exterior brick/stucco. install new electrical, plumbing, hvac, insulation, drywall, doors, fire suppression, roofing, and flooring
Mcr demolition 12 fire and water damaged interior finishes and exterior brick/stucco. install new electrical, plumbing, hvac, insulation, drywall, doors, fire suppression, roofing, and flooring
City of Dallas permitCommercial Alteration Addition PermitProperty removed accounts on all house panels by mistake. all buildings need to be release so txu can assignee a new electrical account account“
Property removed accounts on all house panels by mistake. all buildings need to be release so txu can assignee a new electrical account account“
City of Dallas permitCommercial Electrical PermitBuilding 6 had a few apt burnt in fire.. building 6 house pannel feeds building 7 and 8there is no damage to electrical roomwe are needing a green tag to energize the building“
Building 6 had a few apt burnt in fire.. building 6 house pannel feeds building 7 and 8there is no damage to electrical roomwe are needing a green tag to energize the building“
City of Dallas permitCommercial Electrical PermitTrinity valley plumbing services proposes to install new natural gas line from existing gas meter to boiler units at buildings 4 & 11.upon project approval, trinity valley to call 1-800-dig-tess to locate and identify utilities within planned excavation path.upon identification of utilities, trinity valley to commence excavation operations within 48 hours.trinity valley to excavate and trench 1075 lf to complete above mentioned scope of work.upon completion of 75% of trenching, trinity valley plumbing services to mobilize plumbing team to begin 2" polyethylene pipe. during excavation operations, scope of work will require trinity valley to saw-cut asphalt drives at two locations (between building 1 & 11, between building 1 & 2). trinity valley's scope of work includes use of steel plates to ensure traffic is not disrupted for the duration of this project. upon completion of project, trinity valley to repair asphalt and restore it to original condition prior to construction operations.separate 2" polyethylene gas lines will be installed for each boiler and tied together near the gas meter, each with it's own isolation valve. gas regulators and all associated fittings will be installed for both boiler rooms.tracer wire to be laid alongside both gas lines to allow for future location and identification. upon completion of the installation, the entire gas system will be pressure tested to ensure there are no leaks. trinity valley to coordinate and call in all required inspections, and obtain green tag approval prior to backfilling areas of excavation. once inspection has been passed by the city of dallas, all trenches including those under concrete or asphalt will be backfilled, and all disturbed areas will be restored to their original condition, ensuring the site is clean and properly finished.trinity valley to clean all work areas, and remove all debris from the site.excavationexcavate 1075 lf of trench at 18" d.building. 1 - building. 4 trench: 655 lfbldg. 1 - building. 11 trench: 420 lf
Trinity valley plumbing services proposes to install new natural gas line from existing gas meter to boiler units at buildings 4 & 11.upon project approval, trinity valley to call 1-800-dig-tess to locate and identify utilities within planned excavation path.upon identification of utilities, trinity valley to commence excavation operations within 48 hours.trinity valley to excavate and trench 1075 lf to complete above mentioned scope of work.upon completion of 75% of trenching, trinity valley plumbing services to mobilize plumbing team to begin 2" polyethylene pipe. during excavation operations, scope of work will require trinity valley to saw-cut asphalt drives at two locations (between building 1 & 11, between building 1 & 2). trinity valley's scope of work includes use of steel plates to ensure traffic is not disrupted for the duration of this project. upon completion of project, trinity valley to repair asphalt and restore it to original condition prior to construction operations.separate 2" polyethylene gas lines will be installed for each boiler and tied together near the gas meter, each with it's own isolation valve. gas regulators and all associated fittings will be installed for both boiler rooms.tracer wire to be laid alongside both gas lines to allow for future location and identification. upon completion of the installation, the entire gas system will be pressure tested to ensure there are no leaks. trinity valley to coordinate and call in all required inspections, and obtain green tag approval prior to backfilling areas of excavation. once inspection has been passed by the city of dallas, all trenches including those under concrete or asphalt will be backfilled, and all disturbed areas will be restored to their original condition, ensuring the site is clean and properly finished.trinity valley to clean all work areas, and remove all debris from the site.excavationexcavate 1075 lf of trench at 18" d.building. 1 - building. 4 trench: 655 lfbldg. 1 - building. 11 trench: 420 lf
City of Dallas permitCommercial Plumbing PermitBuilding 4 locate gas leak for properties gas lines through out property gas leak detection services proceed with the necessary repairs
Building 4 locate gas leak for properties gas lines through out property gas leak detection services proceed with the necessary repairs
City of Dallas permitCommercial Plumbing Permit
Sources: City of Dallas
Questions about 13250 Emily Rd
What is being built at 13250 Emily Road?
The permits indicate repairs and reconstruction of 12 fire- and water-damaged apartments, not a new building. The work includes repairs to electrical, plumbing, HVAC, insulation, drywall, roofing and other finishes.
Are new apartments being built at 13250 Emily Road?
The available permits describe repairs to existing apartments, not new apartment construction. A Dallas alteration permit filed October 23, 2025, covers work on 12 damaged units.
When were permits filed for repairs at 13250 Emily Road?
The Dallas repair permit COM-ALT-ADD-25-001548 was filed October 23, 2025. Additional permits for the 12 units were filed between June 4 and July 7, 2026.
What happened to the apartments at 13250 Emily Road?
Dallas permit descriptions say 12 apartments were affected by fire and water damage. The permits cover reconstruction and repairs to building systems and interior and exterior finishes.
What work is planned for the damaged apartments?
Permits describe electrical, plumbing and HVAC work, along with insulation, drywall, doors, fire suppression, roofing and flooring. A June 4, 2026, alteration permit lists these repairs for 12 units.
What are the latest permits for 13250 Emily Road?
The latest records provided are plumbing permits filed July 2 and July 7, 2026. They cover plumbing reconstruction and fixture installation for the fire-damaged apartments.
Also being built nearby
All of 75240- 13259 Emily RdOct 13, 2020Repair fire damage no structural changes · 23 m away
- 8131 Lbj Freeway 360 · Gateway Partners LLCJul 22, 2024Spectracorp — renovation/alteration — interior office renovation · 224 m away
- 8131 Lbj Freeway · Gateway Partners LLCJul 17, 2024Compumed — renovation/alteration — interior office renovation · 224 m away
- 8131 Lbj Freeway · Gateway Partners LLCNov 13, 2024Us health advisors — renovation/alteration — interior office renovation · 224 m away
- 13340 Kit LnAug 19, 2026Cold main reroute & 50 gal electric water heater 5' tunnel · 234 m away
- 8111 L B J FwyOct 27, 2020Interior remodel only · 245 m away
- 13353 Emily RdDec 15, 2025Replace meter lug · 266 m away
- 13335 Kit LnFeb 9, 2026Install new gas line in yard for both units 13337 and uint 13335 from city meter house connection · 292 m away
- 13239 Kit LnOct 20, 2020Replace water heater & replace/test gas service · 301 m away
- 13236 Kit LnDec 14, 2020Repair fire damage no structural changes unit 112 and 212 · 316 m away
- 13231 Kit LnOct 9, 2025Under slab sewer replacement · 316 m away
- 13366 Southview LnAug 13, 2025Remove existing roof and install new roof · 324 m away
More apartments & multifamily in 75240, demolitions in 75240, offices in 75240.