Permits filed for rooftop solar and battery system

City of Dallas permits filed January 15, 2026, indicate installation of an 18.480-kW rooftop solar system with 42 panels and battery equipment at 13322 Purple Sage Rd. The records also list a Tesla Powerwall 3 and electrical work for the installation.

Summarized from City of Dallas records · updated Jan 15, 2026

Projects
2
2 filings
Latest filing
Jan 15, 2026
since Jan 15, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Mcr with battery install a 18.480 kw roof mounted pv solar system - 42 panels, a tesla powerwall-3, tesla energy gateway-3, enphase iq gateway, tesla remote meter. utility shutdown required to install teg between meter and (n) span

    Mcr with battery install a 18.480 kw roof mounted pv solar system - 42 panels, a tesla powerwall-3, tesla energy gateway-3, enphase iq gateway, tesla remote meter. utility shutdown required to install teg between meter and (n) span

    City of Dallas permitResidential Solar/PV Permit
    Record
    RES-SOLAR-25-000744
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install a 18.480 kw roof mounted pv solar system - 42 panels, a tesla powerwall-3, tesla energy gateway-3, enphase iq gateway, tesla remote meter. utility shutdown required to install teg between meter and (n) span

    Install a 18.480 kw roof mounted pv solar system - 42 panels, a tesla powerwall-3, tesla energy gateway-3, enphase iq gateway, tesla remote meter. utility shutdown required to install teg between meter and (n) span

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-000315
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 13322 Purple Sage Rd

What is being built at 13322 Purple Sage Rd?

City of Dallas permits indicate a rooftop solar installation with 42 panels and a battery system. The permits were filed January 15, 2026.

How large is the solar system at 13322 Purple Sage Rd?

The permit descriptions list an 18.480-kW roof-mounted photovoltaic system with 42 panels.

Will the solar installation at 13322 Purple Sage Rd include a battery?

Yes. The permit descriptions list a Tesla Powerwall 3, a Tesla Energy Gateway 3, and related electrical equipment.

When were permits filed for solar panels at 13322 Purple Sage Rd?

Both City of Dallas records are dated January 15, 2026: solar permit RES-SOLAR-25-000744 and electrical permit RES-ELC-26-000315.

Do the permits show that the solar system at 13322 Purple Sage Rd is complete?

The records describe permitted installation work, but do not list a completion status.