Permits filed for rooftop solar and battery system
City of Dallas permits filed January 15, 2026, indicate installation of an 18.480-kW rooftop solar system with 42 panels and battery equipment at 13322 Purple Sage Rd. The records also list a Tesla Powerwall 3 and electrical work for the installation.
Summarized from City of Dallas records · updated Jan 15, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 15, 2026
- since Jan 15, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsMcr with battery install a 18.480 kw roof mounted pv solar system - 42 panels, a tesla powerwall-3, tesla energy gateway-3, enphase iq gateway, tesla remote meter. utility shutdown required to install teg between meter and (n) span
Mcr with battery install a 18.480 kw roof mounted pv solar system - 42 panels, a tesla powerwall-3, tesla energy gateway-3, enphase iq gateway, tesla remote meter. utility shutdown required to install teg between meter and (n) span
City of Dallas permitResidential Solar/PV PermitInstall a 18.480 kw roof mounted pv solar system - 42 panels, a tesla powerwall-3, tesla energy gateway-3, enphase iq gateway, tesla remote meter. utility shutdown required to install teg between meter and (n) span
Install a 18.480 kw roof mounted pv solar system - 42 panels, a tesla powerwall-3, tesla energy gateway-3, enphase iq gateway, tesla remote meter. utility shutdown required to install teg between meter and (n) span
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 13322 Purple Sage Rd
What is being built at 13322 Purple Sage Rd?
City of Dallas permits indicate a rooftop solar installation with 42 panels and a battery system. The permits were filed January 15, 2026.
How large is the solar system at 13322 Purple Sage Rd?
The permit descriptions list an 18.480-kW roof-mounted photovoltaic system with 42 panels.
Will the solar installation at 13322 Purple Sage Rd include a battery?
Yes. The permit descriptions list a Tesla Powerwall 3, a Tesla Energy Gateway 3, and related electrical equipment.
When were permits filed for solar panels at 13322 Purple Sage Rd?
Both City of Dallas records are dated January 15, 2026: solar permit RES-SOLAR-25-000744 and electrical permit RES-ELC-26-000315.
Do the permits show that the solar system at 13322 Purple Sage Rd is complete?
The records describe permitted installation work, but do not list a completion status.
Also being built nearby
All of 75240- 13336 Purple Sage RdOct 2, 2026Residential re-roof · 27 m away
- 13345 Purple Sage RdJun 16, 2026Pool p trap · 39 m away
- 13307 Purple Sage RdNov 5, 2025Mini split install · 48 m away
- 13131 Tahoe DrJan 5, 2021Foundation repair · 95 m away
- 13125 Tahoe DrJan 7, 2021Electrical remodel · 126 m away
- 13218 Roaring Springs LnFeb 12, 2026Rsvp new home construction · 146 m away
- 13315 Spring Grove AveDec 7, 2020Replace furnacne coil & condenser · 148 m away
- 13406 Spring Grove AveSep 30, 2020Replace or modify existing hvac · 172 m away
- 13405 Spring Grove AveAug 18, 2026Under slab sewer replacement · 174 m away
- 13410 Purple Sage StJan 11, 2021Replace or modify existing hvac · 177 m away
- 13216 Rolling Hills LnMay 12, 2025Gas line to pool heater for remodel with gas meter release · 181 m away
- 13121 Brushcreek LnOct 22, 2025Sewer combo liner repipe · 188 m away
More solar installs in 75240.